BLD-Final | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
Dave Hannah
|
|
|
permit needs to be doc finaled - fire passed
|
FIRE-Final Inspection | 1/24/2020 | 1/27/2020 | 1/27/2020 | A | PASS |
Jim Page
|
|
|
Hardware for door 418A has been approved per notes entered 23JAN2020 and will be free egress, not access controlled, final life fire safety inspection is complete.
Jon Phone #: ###-####
|
BLD-Final | 1/22/2020 | 1/22/2020 | 1/22/2020 | P | PART |
Dave Hannah
|
|
|
Jon Phone #: ###-#### ok for tco ok for perm co after fire gos perm
|
FIRE-Final Inspection | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety complete, delayed egress has not been installed on door 418A, this door has a pass through function door handle that is compliant door 418A is in the path of egress and does have an electric strike, door hardware will need to be reviewed for acceptance. Fire sprinkler inspection is complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. 30 day TCO authorized for life fire safety.
late am // Jon Phone #: ###-####
|
FIRE-Conference | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | CANC |
Jim Page
|
|
|
Jon Phone #: ###-#### // canceled per Jon 1-17-20
|
FIRE-Final Inspection | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | NR |
Jim Page
|
|
|
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 12/24/2019 | 12/26/2019 | 12/26/2019 | A | PASS |
Dave Hannah
|
|
|
Jon Phone #: ###-####
|
BLD-Framing/Rough-in | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PART |
Tony Young
|
|
|
John Phone #: ###-####,, 3 office walls ok,, noted on frame sticker
|
BLD-Final | 12/2/2019 | 12/2/2019 | 12/2/2019 | P | PASS |
Jim Storey
|
|
|
jon Phone #: ###-#### 4th floor restarooms ok phase 3.
|
FIRE-Final Inspection | 12/2/2019 | 12/2/2019 | 12/2/2019 | P | PART |
Jim Page
|
|
|
Final life fire safety inspction for restrooms complete.
jon Phone #: ###-####
|
BLD-Conference | 11/19/2019 | 11/19/2019 | 11/21/2019 | P | DONE |
Dave Hannah
|
|
|
Jon Phone #: ###-####
|
BLD-Conference | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | DONE |
Dave Hannah
|
|
|
Jon Phone #: ###-####
|
BLD-Final | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### ok to move into phase two
|
FIRE-Final Inspection | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | PART |
Jim Page
|
|
|
Final life fire safety inspection for phase 2 complete.
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/6/2019 | 11/6/2019 | 11/6/2019 | P | PASS |
Dave Hannah
|
|
|
Jon Phone #: ###-####
|
BLD-Framing/Rough-in | 10/28/2019 | 10/29/2019 | 10/29/2019 | A | PASS |
Dave Hannah
|
|
|
Jon Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Mike Jordan
|
|
|
cover.. as late as possible // Jon Phone #: ###-####. phase 2A ok.
|
BLD-Conference | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | DONE |
Dave Hannah
|
|
|
Jon Phone #: ###-####
|
BLD-Framing/Rough-in | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | PASS |
Dave Hannah
|
|
|
Jon- please call 15 min before Phone #: ###-#### phase 2b walls ok to cover
|
BLD-Final | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### phase 1 ok for temp occ
|
FIRE-Final Inspection | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PART |
Jim Page
|
|
|
Areas inspected are for phase 1 TCO, fire sprinkler ispection for phase 1 TCO complete, fire alarm inspection for phase 1 TCO complete, fire extinguishers are placed with current inspection tags for TCO phase 1, final inspection for life fire safety phase 1 TCO complete, ceilings tiles are to be placed in little corridor north of the elevators, ceilings tiles need to be in place for fire sprinkler heat collection, to be placed before final BLD inspection for phase 1 TCO.
Jon Phone #: ###-####
|
FIRE-Conference | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | DONE |
Jim Page
|
|
|
Fire conference complete.
call to meet // Jon Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/17/2019 | 9/17/2019 | 9/18/2019 | P | PART |
Dave Hannah
|
|
|
Call ahead 15 minutes - late pm // Jon Phone #: ###-#### phase one ok
|
BLD-Conference | 9/13/2019 | 9/13/2019 | 9/14/2019 | P | DONE |
Dave Hannah
|
|
|
call 15 mins before // John Phone #: ###-####
|
BLD-Conference | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | DONE |
Dave Hannah
|
|
|
late am // 4th floor // Jon Phone #: ###-####
|
BLD-Framing/Rough-in | 8/22/2019 | 8/22/2019 | 8/22/2019 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 8/14/2019 | 8/14/2019 | 8/15/2019 | P | PART |
Dave Hannah
|
|
|
Call 15 min ahead // Jon Phone #: ###-#### phase one ok to cover walls
|