Permit Information
Permit NumberBLD19-01462
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2307 S TRAPPER PL
Project NameHarris North Lot 23 Block 1
Customer Number 
ePlanReviewYes
Description
**HILLSIDE** **WUI FOOTHILLS ZONE A** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 3546 sq. ft., one story single family dwelling with 3 bedrooms, 4.5 bathrooms, approximately 444 sq. ft. of covered patio/porch and a 824 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. JJN
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

SPRINKLERS ARE REQUIRED. LGM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/12/201912/13/201912/13/2019APASS
DetailsBrandon Shaw
Less Phone #: ###-####
DOC - Permit Finaled12/13/201912/13/201912/13/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results12/13/201912/13/201912/13/2019ADONE
DetailsBrandon Shaw
ACH50- 4.1
BLD-Energy code compliance9/9/20199/10/20199/10/2019APASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Energy code compliance9/9/20199/9/20199/9/2019PNR
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Energy code compliance9/6/20199/9/20199/9/2019ACANC
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Framing/Rough-in9/5/20199/5/20199/5/2019PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Other8/30/20198/30/20198/30/2019PPASS
DetailsBrandon Shaw
soffett // Les Phone #: ###-####
BLD-Wall Bracing7/17/20197/17/20197/17/2019PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Foundation6/25/20196/25/20196/25/2019PPASS
DetailsBrandon Shaw
Deon- foundation wall inspection Phone #: ###-####
BLD-Footing6/24/20196/24/20196/24/2019PNR
DetailsBrandon Shaw
Need Geo soil subgrade submitted and approved by PW...