BLD-Final | 6/4/2020 | 6/5/2020 | 6/5/2020 | A | PART |
Tony Young
|
|
|
Jay *screened* Phone #: ###-####,, temp guard rail ok,, occupancy ok
|
BLD-Final | 6/3/2020 | 6/3/2020 | 6/4/2020 | P | PART |
Tony Young
|
|
|
This may be more of a consult, but want to make sure I''m not missing anything. Thanks, Tony. Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole// needs hand/guard rails
|
BLD-Final | 6/4/2020 | 6/4/2020 | 6/4/2020 | P | PART |
Tony Young
|
|
|
Jay *screened* Phone #: ###-#### // conf only
|
BLD-Footing | 5/12/2020 | 5/13/2020 | 5/14/2020 | A | PART |
Dave Hannah
|
|
|
Jay Phone #: ###-#### ok to pour south section of ftg
|
BLD-Energy code compliance | 4/6/2020 | 4/6/2020 | 4/6/2020 | P | PASS |
Tony Young
|
|
|
Thank you. Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole
|
BLD-Framing/Rough-in | 4/6/2020 | 4/6/2020 | 4/6/2020 | P | PASS |
Tony Young
|
|
|
Re-inspect for fire blocking. We will be ready late morning or any time after. Thank you. Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole
|
BLD-Framing/Rough-in | 4/1/2020 | 4/2/2020 | 4/2/2020 | A | PART |
Dave Hannah
|
|
|
I''ll be on site. Thanks, Tony. Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole 1 st floor ok to insulate needs to install fire places and get rough ins needs to fire block basement fur downs and fur outs
|
BLD-Framing/Rough-in | 3/30/2020 | 3/31/2020 | 3/31/2020 | P | CANC |
Tony Young
|
|
|
cancel per Jay Phone #: ###-####
|
BLD-Footing | 1/24/2020 | 1/27/2020 | 1/27/2020 | A | PASS |
Tony Young
|
|
|
Inspection for remaining footings that couldn''t be poured previously due to the cribs holding the house off the ground. Please give me 30 minutes notice so I can meet you there. It''s really muddy out back, but if you enter the front of the home you can see the footing forms from the house above if you want to stay out of the mud. Phone #: ###-#### Inspection requested via web by Jay Bedsole
|
BLD-Footing | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PART |
Tony Young
|
|
|
We are scheduled for a 12 noon pour, and setting forms first thing in the morning. If I''m not there, the contact is Perry. Thanks, Jay. Phone #: ###-#### Inspection requested via web by Jay Bedsole// south, east, southern portion of west and north footing ok,, raised house
|