BLD-Final | 10/24/2019 | 10/24/2019 | 10/24/2019 | A | PASS |
Jim Storey
|
|
|
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle no blower door test.
|
DOC - Permit Finaled | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 9/12/2019 | 9/12/2019 | 9/12/2019 | A | CANC |
Jim Storey
|
|
|
check c/n items Inspection cancelled from web by: Joel Hirtle
|
BLD-Framing/Rough-in | 9/11/2019 | 9/11/2019 | 9/12/2019 | P | PART |
Dave Hannah
|
|
|
I have documentation of nails required for the hanger, i will leave on site.
HGUS 7.25/12 face, (56 nails, 0.162x 3-1/2 ) joist (20 nails, 0.162 x 3-1/2 )
Phone #: ###-#### Inspection requested via web by Joel Hirtle ok to insulate but I need jim to check off his c/n itmes rescheduled for tomorrow am after talking with contractor
|
BLD-Framing/Rough-in | 9/9/2019 | 9/10/2019 | 9/10/2019 | A | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 9/8/2019 | 9/9/2019 | 9/9/2019 | A | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle c/n posted
|
BLD-Wall Bracing | 8/27/2019 | 8/28/2019 | 8/28/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Foundation | 8/8/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 8/7/2019 | 8/8/2019 | 8/8/2019 | P | PASS |
Jim Storey
|
|
|
Ricrado Phone #: ###-####
|