BLD-Final | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | PASS |
Dave Hannah
|
|
|
jacob Phone #: ###-####
|
FIRE-Final Inspection | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete, signatures provided on permit sign off card for associated trades.
|
BLD-Final | 11/8/2019 | 11/12/2019 | 11/12/2019 | P | NR |
Brandon Shaw
|
|
|
Failed Fire/Life... No other issues...
|
FIRE-Final Inspection | 11/8/2019 | 11/12/2019 | 11/12/2019 | A | FAIL |
Jim Page
|
|
|
Provided fire alarm modifications as discussed, a seperate per it is required for fire aalrm modifications.
TJ Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Jim Storey
|
|
|
Call for access- Jake Phone #: ###-####
|