Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-01808
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 7503 W NORTHVIEW ST
Project NameSt. Marks Catholic School
Customer Number 
ePlanReviewYes
Description
ST. MARK’S CATHOLIC SCHOOL – ELEMENTARY SCHOOL AND MIDDLE SCHOOL REMODEL) (7-2-19 PLAN MODIFICATION TO CONVERT A TEACHER’S LOUNGE AND COMPUTER LAB BACK TO A CLASSROOM, CHANGE A LIBRARY TO A CLASSROOM, AND TO CONSTRUCT TWO COLLABORATION ROOMS WITHIN A COMPUTER LAB. THE SINGLE-USER TOILET ROOM WITHIN THE OFFICE AREA WILL NOT BE UPGRADED TO BE ACCESSIBLE TO THE DISABLED AT THIS TIME. A NEW RECEPTION ROOM HAVING A SERVICE COUNTER/WINDOW WILL BE EXPANDED, A NEW OFFICE HAVING A SERVICE COUNTER/WINDOW WILL BE EXPANDED, AND A NEW ROOM THAT WAS FORMERLY TO BE A CLASSROOM WILL BE EXPANDED AND USED AS A LIBRARY.) This building will eventually have a fire sprinkler system installed for building area increase, fire area, fire flow, and in lieu of fire rated corridors. To remodel a 15,114 square foot area within the elementary classroom portion of an existing church school. Work is to include new exterior windows (U-factor .28 and SHGC .39), new LED light fixtures, interior finishes, updated technology, two multi-user toilet rooms upgraded to be accessible to the disabled, a single-user toilet room upgraded to be accessible to the disabled, wall infills, new interior walls, new interior windows at new service counters/windows, and the first phase of a fire sprinkler system including the fire sprinkler riser. To remodel a 7,754 square foot area within the middle school classroom portion of an existing church school. Work is to include interior nonbearing walls, new millwork, lockers, vertical grab bars at existing toilets, finishes, and the first phase of a fire sprinkler system. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. This is a scope of work permit. It is not intended to establish a Certificate of Occupancy for any portion of this building. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  3/5/2020 DONE
doc final permit per Building inspection Final done on 08-9-19 by Tell and Fire inspection final done on 10-9-19 by Troy
BLD-Aging Inspection2/21/20202/21/20202/21/2020 CANC
DetailsTell Riley
BLD-Aging Inspection2/20/20202/20/20202/21/2020 PASS
DetailsTell Riley
still need eletrical final see notes
FIRE-Final Inspection10/9/201910/9/201910/9/2019APASS
DetailsTroy Cobbley
Life safety passed.

Inspection of new classroom doors so we can change temp occupancy to full occupancy. Please call me when you''re headed that way so I can meet you. Thanks. Phone #: ###-#### Inspection requested via web by Mike Walling
BLD-Final8/9/20198/9/20198/9/2019PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Mike Walling//add covers to sink drain pipes//temp occupancy approved--fire gave temp for 30 days until door hardware arrives//ok for final occupancy when fire inspections are approved//
FIRE-Final Inspection8/8/20198/9/20198/9/2019APART
DetailsJim Page
Partial final inspection for life fire safety inspection complete. Last remaining items include sway bracing mod fire sprinkler permit, (per conversation with Romeo Gervais with Boise Fire, a temp can be given for 30 days, contingent on the fire sprinkler being re-issued and finaled) and door hardware is the existing round type, plans show lever type hardware that is on back order, will be installed when recieved. Fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. TCO for life fire safety authorized for 30 days.

Phone #: ###-#### Inspection requested via web by Mike Walling
BLD-Final8/8/20198/8/20198/8/2019PCANC
DetailsTell Riley
They are seal-coating the parking lot today, call me when you are on your way and I''ll save a parking spot for you on Northview. Thanks Phone #: ###-#### >> Inspection requested via web by Mike Walling Inspection cancelled from web by: Mike Walling
BLD-Framing/Rough-in6/25/20196/25/20196/25/2019PPASS
DetailsJim Storey
Please call when headed this direction. Thanks Phone #: ###-#### Inspection requested via web by Mike Walling framing ok per engineering being submited to plan review/ change of floor plan offices and comp lab framing ok/ sancuary area walls ok to cover/