Permit Information
Permit NumberBLD19-01905
StatusFinaled
Name SEAN CAFFERTY ENTERPRISES
Site Address 2609 N HARRISON HILLS DR
Project NameLassen Residence
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2500 sq. ft., one story single family dwelling with 2 bedrooms, 2 bathrooms, approximately 180 sq. ft. of covered patio/porch and a 825 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. JJN**SPRINKLERS ARE NOT REQUIRED.**LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/13/20205/15/20205/15/2020APASS
DetailsTony Young
screened // Beth Phone #: ###-####
DOC - Permit Finaled5/15/20205/15/20205/15/2020PPASS
DetailsTony Young
BLD-Final5/12/20205/13/20205/13/2020APART
DetailsTony Young
screened // Beth Phone #: ###-####// needs driveway, landing out of back door,, firecaulking// ok to move items in
BLD-Aging Inspection4/30/20204/30/20205/4/2020 PASS
DetailsTony Young
BLD-Aging Inspection4/29/20204/29/20204/30/2020 PASS
DetailsTony Young
BLD-Conference4/29/20204/29/20204/30/2020PPASS
DetailsTony Young
job conf on final// still work in progress,, ok
BLD-Energy code compliance12/16/201912/17/201912/17/2019APASS
DetailsTony Young
shawn Phone #: ###-####
BLD-Framing/Rough-in12/16/201912/16/201912/16/2019PPASS
DetailsTony Young
shawn Phone #: ###-####,, work in progress on the soffit
BLD-Framing/Rough-in12/9/201912/10/201912/10/2019PPASS
DetailsTony Young
sEAN Phone #: ###-####
BLD-Wall Bracing12/9/201912/10/201912/10/2019APASS
DetailsTony Young
sEAN Phone #: ###-####,, exterior ok
BLD-Energy code compliance12/9/201912/9/201912/9/2019PNR
DetailsTony Young
sEAN Phone #: ###-####
BLD-Framing/Rough-in12/9/201912/9/201912/9/2019PNR
DetailsTony Young
sEAN Phone #: ###-####,, needs trades,, seal pack,, walk through only,,
BLD-Foundation7/17/20197/17/20197/17/2019PPASS
DetailsBrandon Shaw
concrete at 330 wall // Brandon Phone #: ###-####
BLD-Footing7/15/20197/15/20197/15/2019PPASS
DetailsDave Hannah
Brandon-pour time 3:30 Phone #: ###-####