BLD-Final | 7/13/2020 | 7/17/2020 | 7/17/2020 | P | PASS |
Jim Storey
|
|
|
screened // David Phone #: ###-####
|
DOC - Permit Finaled | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | DONE |
Jim Storey
|
|
|
screened // David Phone #: ###-#### 3.6
|
BLD-Energy code compliance | 4/13/2020 | 4/14/2020 | 4/14/2020 | A | PASS |
Tony Young
|
|
|
David Phone #: ###-####// pssed per 301 via phone call
|
BLD-Conference | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | PART |
Tony Young
|
|
|
David- **Cleared** Phone #: ###-####,, needs electrical 1st,, then..,, frame ok to insulate,, need to verify seal pack and furr downs for ducting,, fire blocking
|
BLD-Wall Bracing | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Wall Bracing | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Hunter
|
BLD-Wall Bracing | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | PART |
Jim Storey
|
|
|
shear // David Phone #: ###-#### hd/ north wall nailling
|
BLD-Foundation | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Jim Storey
|
|
|
Request early inspection about 1 Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 8/5/2019 | 8/5/2019 | 8/5/2019 | A | PASS |
Jim Storey
|
|
|
Would like to pour at 10 Phone #: ###-#### Inspection requested via web by Ben Sears
|