BLD-Final | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | DONE |
Tell Riley
|
|
|
Doyle Phone #: ###-####//final complete per description/scope//landscaping will be completed to remove dirt/vegitation from near siding//
|
DOC - Permit Finaled | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | NR |
Tell Riley
|
|
|
Doyle Phone #: ###-####//no roofing on door cover or any accents//
|
BLD-Final | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | CANC |
Tell Riley
|
|
|
Dole Phone #: ###-####//needs electrical final prior to building final//let contact know//
|
FIRE-Final Inspection | 2/5/2020 | 2/5/2020 | 2/5/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Doyle Phone #: ###-####
|
FIRE-Conference | 1/16/2020 | 1/16/2020 | 1/16/2020 | P | DONE |
Troy Cobbley
|
|
|
The phone conferenced with the geal contractor about the possible need for a sprinkler contractor to to determine whether sprinkler coverage is needed in the new construction areas.
|
BLD-Framing/Rough-in | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Tell Riley
|
|
|
Doyle- call for access Phone #: ###-####//final framing for wall accents, installed ledgers with lags and a 35 clips per plans//sheathing was installed at time of inspeciton//
|
BLD-Framing/Rough-in | 12/23/2019 | 12/24/2019 | 12/24/2019 | A | PASS |
Tell Riley
|
|
|
Doyle Phone #: ###-####//south wall in courtyard accent framing//
|
BLD-Framing/Rough-in | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | PART |
Tell Riley
|
|
|
Call half hour before // Doyle Phone #: ###-####//gyp board on side entry per details//north wall in courtyard framing of accents ok//
|
BLD-Framing/Rough-in | 12/17/2019 | 12/18/2019 | 12/18/2019 | A | FAIL |
Tell Riley
|
|
|
call ahead // Doyle Phone #: ###-####//side entry cover--need to add 1 hr over structural beams per plans//
|
BLD-Framing/Rough-in | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | PART |
Tell Riley
|
|
|
Call 30 minutes ahead // Doyle Phone #: ###-####//plan change on wall accents--advised Doyle to submit for plan mod to plan review//
|
BLD-Framing/Rough-in | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | PART |
Tell Riley
|
|
|
Call 30 mins ahead- Doyle Phone #: ###-####//parapet wall ok//wall accent framing ok--need to add 1 hr protection per plans and call for verifiction//side entry framing ok--add 1 hr rated assembly per plans and call for inspection//
|
BLD-Framing/Rough-in | 10/29/2019 | 10/29/2019 | 10/29/2019 | P | NR |
Tell Riley
|
|
|
on parapet wall - Doyle Phone #: ###-####//discussed parapet wall framing//will call when framing is completed//
|
BLD-Framing/Rough-in | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
Tell Riley
|
|
|
Call 30 minutes ahead // Doyle Phone #: ###-####//fire rated covers have been fixed//framing for cover ok//framing inspections for other areas will be required/
|
BLD-Framing/Rough-in | 10/7/2019 | 10/8/2019 | 10/8/2019 | A | PART |
Tell Riley
|
|
|
Doyle-please call when on way Phone #: ###-####//fire rated can light covers need to sit flat to ceilng--some have gaps under them//call in for re-inspection//ok to begin cover//
|
BLD-Framing/Rough-in | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | FAIL |
Tell Riley
|
|
|
call 30 mins before // dowel Phone #: ###-####//need electrical sign off//fire proofing at can lights not approved--use approved fire proofing//call for re-inspection//
|
BLD-Footing | 10/1/2019 | 10/2/2019 | 10/2/2019 | P | PASS |
Tell Riley
|
|
|
Doyle-please call when on way Phone #: ###-####//ok to pour//special inspection was performed for dowels epoxied into footing//
|
BLD-Footing | 9/30/2019 | 10/1/2019 | 10/1/2019 | P | PART |
Tell Riley
|
|
|
call when you are on your way- Dole Phone #: ###-####//footings for cover already poured//oversized from plans//verts will be drilled and epoxied--special inspection required//call for foundation inspection//
|
BLD-Framing/Rough-in | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | FAIL |
Tell Riley
|
|
|
Call half hour before // Doyle Phone #: ###-####//1 hr ceiling does not meet details on plans//submit plan mod for changes in fire rated ceiling//verify penetrations for cans in rated ceiling//
|
BLD-Framing/Rough-in | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | FAIL |
Tell Riley
|
|
|
Doel Phone #: ###-####//no framers onsite//appears to be front entry cover--framing is not visible as framing has already been covered//call for re-inspection//
|
BLD-Framing/Rough-in | 9/23/2019 | 9/25/2019 | 9/24/2019 | A | CANC |
Tell Riley
|
|
|
Doyle -per Doyle need to cancel inspection
|
BLD-Framing/Rough-in | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | PART |
Tell Riley
|
|
|
Doyle Phone #: ###-####//north wing framing of exterior accents ok per plans//ad fire blocking as discussed//call for other wings framing inspections//
|