BLD-Final | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | FAIL |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Provide suite address, Install miorror ADA bathroom.
|
FIRE-Final Inspection | 8/28/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. A suite number is to be provided prior to a building inspection as discussed. Jim Phone #: ###-#### Inspection requested via web by Jim Wellman
|
BLD-Ceiling Grid Inspection | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | FAIL |
Tell Riley
|
|
|
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman//need fire sprinkler inspection// replace insulation--add insulation where missing in ceiling//
|
BLD-Framing/Rough-in | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Interior steel stud framed walls and hardlids only ok, pending mech. and plumbing r.i. inspections.
|