BLD-Aging Inspection | 5/29/2020 | 5/29/2020 | 5/29/2020 | | DEFR |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 5/29/2020 | 5/29/2020 | 5/29/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 1/16/2020 | 1/16/2020 | 1/16/2020 | P | NR |
Jim Storey
|
|
|
open ele permit
|
BLD-Final | 1/15/2020 | 1/16/2020 | 1/16/2020 | A | NR |
Jim Storey
|
|
|
Nate Phone #: ###-#### open ele permit
|
FIRE-Final Inspection | 1/16/2020 | 1/16/2020 | 1/16/2020 | A | PASS |
Jim Page
|
|
|
Fire alarm inspection complete, no fire sprinklers, fire extinguishers not required for this scope, final life fire safety inspection for scope of work complete, signature card not available at time of inspection, no signatures provided.
|
BLD-Final | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PART |
Brandon Shaw
|
|
|
Temp C of O is approved for store only... All permits to be finaled when canopy and fuel island are fininshed...
|
FIRE-Final Inspection | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PART |
Troy Cobbley
|
|
|
A temp for life safety is ok'd by Joe Bruce until the gas islands have been completed/inspected. Previous corrections have been addressed. Nate Phone #: ###-####
|
BLD-Framing/Rough-in | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | PASS |
Jim Storey
|
|
|
N side wall - Nate Phone #: ###-#### north wall ok/ need si for welds on east wall
|