BLD-Final | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
DOC - Permit Finaled | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | DONE |
Mike Jordan
|
|
|
4.9
|
BLD-Energy code compliance | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Framing/Rough-in | 10/25/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Framing/Rough-in | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | FAIL |
Mike Jordan
|
|
|
SAM Phone #: ###-####. Complete lateral bacing on A02,A04, A05 and A07 trusses. Nail off B3 2ply truss per the engineering Provide header over masgterbedroom door to support the continous bearing of the A2 truss above. Correction notice posted. Ok to insulate.
|
BLD-Framing/Rough-in | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | FAIL |
Mike Jordan
|
|
|
sam Phone #: ###-####. Provided truss engineering does not match instaleed trusses. DO NOT INSULATE. Needs to provide the correct truss engineering.
|
BLD-Wall Bracing | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
Mike Jordan
|
|
|
sam Phone #: ###-####
|
BLD-Footing | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | PASS |
Mike Jordan
|
|
|
Erme Phone #: ###-####
|