BLD-Final | 12/24/2019 | 12/24/2019 | 12/24/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 12/24/2019 | 12/24/2019 | 12/24/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 12/24/2019 | 12/24/2019 | 12/24/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.79
|
BLD-Ceiling Grid Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
Brandon Shaw
|
|
|
soffett // Les Phone #: ###-####
|
BLD-Energy code compliance | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | PART |
Jim Storey
|
|
|
Les Phone #: ###-#### c/n a-7 bracing web 1/3 points at entry/ stud under single plate to header.// bg1 brace interior end top cord.
ok to insulate.
|
BLD-Wall Bracing | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress... Hold downs and strap to be installed before framing rough-in...
|
BLD-Wall Bracing | 8/20/2019 | 8/21/2019 | 8/20/2019 | A | CANC |
Brandon Shaw
|
|
|
shear // Les Phone #: ###-####-called in wrong permit number
|
BLD-Foundation | 7/26/2019 | 7/26/2019 | 7/26/2019 | P | PASS |
Jim Storey
|
|
|
11am if possible please Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Footing | 7/25/2019 | 7/25/2019 | 7/25/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|