BLD-Final | 1/14/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//corrections made final complete//
|
DOC - Permit Finaled | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Blower Door Test Results | 1/14/2020 | 1/14/2020 | 1/14/2020 | A | DONE |
Tell Riley
|
|
|
4.8 ACH 50
|
BLD-Final | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//CN posted on electrical panel--need to seal gyp board behind and around furnace--need to fix smoke detector in 1st floor bedroom, battery not installed/or dead//
|
BLD-Energy code compliance | 10/21/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson
|
BLD-Framing/Rough-in | 10/18/2019 | 10/21/2019 | 10/21/2019 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//ok to insulate//
|
BLD-Wall Bracing | 10/1/2019 | 10/3/2019 | 10/3/2019 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//check holddowns that need replaced at framing//
|
BLD-Wall Bracing | 9/30/2019 | 10/1/2019 | 10/1/2019 | P | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//not all braced panels installed//hold downs not nailed//portal frames not complete//
|
BLD-Wall Bracing | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | CANC |
Tell Riley
|
|
|
Phone #: ###-#### >> Inspection requested via web by James Jackson Inspection cancelled from web by: James Jackson
|
BLD-Footing | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Tell Riley
|
|
|
Sergio Phone #: ###-####
|