BLD-Final | 1/14/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//corrections made//final complete//
|
DOC - Permit Finaled | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//CN posted on electrical panel--need bollard for mechanical protection-need to seal gyp board behind furnace//
|
BLD-Blower Door Test Results | 1/14/2020 | 1/14/2020 | 1/14/2020 | A | DONE |
Tell Riley
|
|
|
5.0 ACH 50
|
BLD-Energy code compliance | 10/15/2019 | 10/16/2019 | 10/16/2019 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson
|
BLD-Framing/Rough-in | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//corrections made//
|
BLD-Framing/Rough-in | 10/11/2019 | 10/14/2019 | 10/14/2019 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//need truss plans and fire blocking at concealed space//ok to insulate only//
|
BLD-Wall Bracing | 9/20/2019 | 9/23/2019 | 9/23/2019 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//ok to wrap exterior//check blocking and portal frame straps at framing//will need to add holddown at front door where STHD14 is in wrong location//
|
BLD-Footing | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | PASS |
Tell Riley
|
|
|
Gilbert Phone #: ###-####//setbacks ok per plans//
|