BLD-Final | 3/20/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
DOC - Permit Finaled | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Blower Door Test Results | 3/20/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon 3.9
|
BLD-Framing/Rough-in | 1/7/2020 | 1/7/2020 | 1/7/2020 | P | PEND |
Brandon Shaw
|
|
|
Hold downs at- two under first floor landing, and one at first floor bedroom to be installed with proper hardware...
|
BLD-Energy code compliance | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Framing/Rough-in | 12/27/2019 | 12/30/2019 | 12/30/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Framing/Rough-in | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | FAIL |
Brandon Shaw
|
|
|
1st floor only... Hold downs to be as per plans, and installed per manufactures installation instructions...
|
BLD-Wall Bracing | 10/23/2019 | 10/24/2019 | 10/24/2019 | A | PART |
Brandon Shaw
|
|
|
Work in progress... Floor to floor straps and hold downs to be as per plans before framing rough-in...
|
BLD-Foundation | 9/3/2019 | 9/3/2019 | 9/3/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|