BLD-Final | 12/18/2019 | 12/19/2019 | 12/19/2019 | A | PASS |
Mike Jordan
|
|
|
Greg Phone #: ###-####
|
DOC - Permit Finaled | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Mike Jordan
|
|
|
Greg Phone #: ###-####. All framing issues resolved.
|
BLD-Framing/Rough-in | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | PASS |
Tell Riley
|
|
|
Tyler Phone #: ###-####//need to add truss bracing and bracing at overbuild 4 ft oc///ok to insulate//
|
BLD-Framing/Rough-in | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | CANC |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Wall Bracing | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Wall Bracing | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | FAIL |
Mike Jordan
|
|
|
Greg - Sheer wall insp Phone #: ###-####. Noted several areas missing fasteners. Correction notice posted.
|
BLD-Foundation | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Mike Jordan
|
|
|
Desmond (?)-pour time 4:00 Phone #: ###-####
|
BLD-Footing | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PASS |
Mike Jordan
|
|
|
irma Phone #: ###-####
|
BLD-Conference | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | DONE |
Mike Jordan
|
|
|
Greg Phone #: ###-####. Met contractor on site to observe the finished excavation. Material is 7 to 8 inch minus pit run. Per the contractor, non is fill matersl, all cut. Did note that the top 6 to 8 inches is losse. It was decided to compactbottom of excavation prior to buildinng forms.
|