BLD-Final | 6/3/2020 | 6/4/2020 | 6/4/2020 | A | PASS |
Tell Riley
|
|
|
screened // Brandon Phone #: ###-####//see zoning for easment vacation///
|
DOC - Permit Finaled | 6/4/2020 | 6/4/2020 | 6/4/2020 | P | PASS |
Tell Riley
|
|
|
easment vacated and email recieved from zoning allowing occupancy//
|
BLD-Conference | 5/27/2020 | 6/5/2020 | 6/4/2020 | A | CANC |
Tell Riley
|
|
|
follow up on easement// Brandon ###-####//
|
BLD-Conference | 4/29/2020 | 5/27/2020 | 5/27/2020 | A | DONE |
Tell Riley
|
|
|
follow up on easement//###-####//Brandon//approved by council, waiting on signed resolution and ok from zoning//will follow up//
|
BLD-Conference | 3/25/2020 | 4/29/2020 | 4/29/2020 | A | DONE |
Tell Riley
|
|
|
status on easments//Brandon Phone #: ###-####//discussed with Brandon, no information yet on if easment has been vacated// will check back in 30 days or Brandon will contact me//
|
BLD-Blower Door Test Results | 3/25/2020 | 3/25/2020 | 3/25/2020 | P | DONE |
Tell Riley
|
|
|
2.49 ACH 50
|
BLD-Final | 3/24/2020 | 3/25/2020 | 3/25/2020 | A | PART |
Tell Riley
|
|
|
Brandon Phone #: ###-####//ok for temp until easment is vacated//check back 30 days//
|
BLD-Conference | 3/23/2020 | 3/24/2020 | 3/24/2020 | A | DONE |
Tell Riley
|
|
|
call ahead // Brandon Phone #: ###-####
|
BLD-Wall Bracing | 1/7/2020 | 1/7/2020 | 1/7/2020 | P | PASS |
Tell Riley
|
|
|
interior shear in garage, nailing verified by photos sent from contractor at joint, specifically asked about blocking and he asured that blocks were in place at time of nailing// ok to cover//
|
BLD-Wall Bracing | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | FAIL |
Tell Riley
|
|
|
brandon Phone #: ###-####//area in garage that needed blocked at joints and nailed has been taped and mudded--cannot see nails to verify blocking//CN still posted//
|
BLD-Wall Bracing | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | PART |
Tell Riley
|
|
|
brandon Phone #: ###-####//inside of house ok--tall wall in garage needs to be blocked at break (edges) and nailed for shear per plans//CN issued for garage area//
|
BLD-Wall Bracing | 12/27/2019 | 12/30/2019 | 12/30/2019 | P | FAIL |
Tell Riley
|
|
|
Brandon Phone #: ###-####//need to add nails for 4" pattern per plans//add blocks and nails at edges on garage//
|
BLD-Wall Bracing | 12/23/2019 | 12/24/2019 | 12/24/2019 | A | FAIL |
Tell Riley
|
|
|
brandon Phone #: ###-####//interior GB shear does not meet plans//add nails and block edges//
|
BLD-Energy code compliance | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | PASS |
Tell Riley
|
|
|
Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | PASS |
Tell Riley
|
|
|
Matt Phone #: ###-####//corrections made//
|
BLD-Framing/Rough-in | 12/9/2019 | 12/11/2019 | 12/11/2019 | A | PART |
Tell Riley
|
|
|
Matt Phone #: ###-####//correction notice posted//ok to insulate//
|
BLD-Wall Bracing | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PASS |
Tell Riley
|
|
|
shear // Matt Phone #: ###-####//plan mod changes reflect onsite shear per enginnering//
|
BLD-Wall Bracing | 11/8/2019 | 11/12/2019 | 11/12/2019 | A | FAIL |
Tell Riley
|
|
|
shear // Matt Phone #: ###-####//need plan mod for changes in shear locations--provide updated engineering as all shear walls are engineered//add hold downs at garage PFH per plans//
|
BLD-Footing | 8/26/2019 | 8/27/2019 | 8/27/2019 | A | PASS |
Tell Riley
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | PART |
Tell Riley
|
|
|
Ryan Phone #: ###-####//WIP//
|