BLD-Final | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.84
|
BLD-Blower Door Test Results | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | CANC |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Blower Door Test Results | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | CANC |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Energy code compliance | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Other | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Brandon Shaw
|
|
|
sofit // Les Phone #: ###-####
|
BLD-Framing/Rough-in | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT... OK to insulate...
|
BLD-Framing/Rough-in | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | FAIL |
Brandon Shaw
|
|
|
Provide an approved Engineer fix for A11 truss with 8' of missing bottom cord... Per plans- (4) 2x6 needed ar corner point load- breakfast nook... Per plans- (2) 2x10 called for at center window, breakfasr nook... Verify (2) 9 1/2 LvL and LSTA24 straps are in place- see plans... Verify BTM cord to DBL top plate with A34 anchors at 32" o.c....
|
BLD-Wall Bracing | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Foundation | 8/30/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 8/28/2019 | 8/28/2019 | 8/28/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|