BLD-Final | 3/9/2020 | 3/9/2020 | 3/9/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Jones//complete per plans and plan modifications//
|
DOC - Permit Finaled | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 2/25/2020 | 2/26/2020 | 2/26/2020 | P | NR |
Tell Riley
|
|
|
Steve Phone #: ###-####//need to change door per plan mod//
|
FIRE-Final Inspection | 2/25/2020 | 2/26/2020 | 2/26/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Steve Phone #: ###-####
|
BLD-Final | 1/29/2020 | 1/30/2020 | 1/30/2020 | P | FAIL |
Brandon Shaw
|
|
|
See previous entry- Fire and Life... 30 day TCO is OK'd... No other issues...
|
FIRE-Final Inspection | 1/29/2020 | 1/30/2020 | 1/30/2020 | A | PART |
Jim Page
|
|
|
Reviewed plans are not in e-plan, blue prints were a paper print review. Floor plan has minor changes that need to be reflected on the city approved drawings. Provided the GC with the reviewers information for architect submittal. In field conditions are code compliant, city approved drawings need to reflect installed floor plan. 30 day TCO auhtorized for life fire safety, after plans are reviewed, acccepted and show floor plan changes then life fire safety can be finaled, signatures provided on permit sign off card.
Phone #: ###-#### Inspection requested via web by Steve Jones
|
BLD-Framing/Rough-in | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Jones//wall cover only//plumbing rough in was completed on a different permit//
|