BLD-Final | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Tell Riley
|
|
|
Tom Phone #: ###-####//Site asbuilt inspection completed and signed and sealed approval letter provided by design Engineer//no mechanical due to plan mod and no changes to mechanical//no plumbing due to plan mod and no changes to existing plumbing//
|
DOC - Permit Finaled | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Tell Riley
|
|
|
|
FIRE-Final Inspection | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, no fire alarm modificaitons, final life fire safety inspection for vanilla TI complete, signatures provided on permit sign off card. As noted it project description, no occupancy allowed under this permit.
Tom Phone #: ###-####
|
BLD-Final | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | NR |
Tell Riley
|
|
|
Tom Phone #: ###-####//need special isnpection report//talked with Tom, may need to have pull test as no specials were completed, he will talk with design engineer//
|
BLD-Energy code compliance | 11/5/2019 | 11/6/2019 | 11/6/2019 | A | PASS |
Tell Riley
|
|
|
Tom Phone #: ###-####//framing and insulation//
|
BLD-Framing/Rough-in | 10/30/2019 | 10/31/2019 | 10/31/2019 | A | DONE |
Dave Hannah
|
|
|
shear // Tom Phone #: ###-####
|
BLD-Wall Bracing | 10/30/2019 | 10/31/2019 | 10/31/2019 | A | PASS |
Dave Hannah
|
|
|
shear // Tom Phone #: ###-#### back ext wall ok to insulate
|
BLD-Framing/Rough-in | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | PART |
Tell Riley
|
|
|
Tom Phone #: ###-####//need to add blocks and nailing to shear in back wall//front new store front ok//no trades to be installed//
|