BLD-Final | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | PASS |
Tell Riley
|
|
|
Katie Phone #: ###-####//corrections made final complete//
|
DOC - Permit Finaled | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | CANC |
Tell Riley
|
|
|
Office number Phone #: ###-####//not ready//CN still poste//
|
BLD-Final | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | FAIL |
Tell Riley
|
|
|
Katie Phone #: ###-####//CN issued for steps, crossover connection covers and backfill onsite//
|
BLD-Foundation | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PART |
Tell Riley
|
|
|
late morning-Kyle Phone #: ###-####//wall rebar per plans//vents installed// wip
|
BLD-Conference | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | DONE |
Tell Riley
|
|
|
met onsite with GC over setbacks//no pins were located--looks to be in location of prior MH based on Google images and parcel data//talked with Bob and discussed situation//should be fine to continue//
|
BLD-Footing | 10/21/2019 | 10/23/2019 | 10/23/2019 | A | PART |
Tell Riley
|
|
|
KYLE Phone #: ###-####//signed card ok per plans//still working on rebar verts and hold downs// will be getting in before pour//
|
BLD-Footing | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | CANC |
Tell Riley
|
|
|
Kyle Phone #: ###-####
|