BLD-Final | 6/16/2020 | 6/17/2020 | 6/17/2020 | A | PASS |
Mike Jordan
|
|
|
Screened- Tom Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once electrical and plumbing sign perm.
|
FIRE-Final Inspection | 6/8/2020 | 6/9/2020 | 6/9/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Hardware on Mech Room door to be single action, to be verified by the building inspector.
screeend // Tom Phone #: ###-####
|
FIRE-Final Inspection | 6/4/2020 | 6/4/2020 | 6/4/2020 | P | FAIL |
Troy Cobbley
|
|
|
Provide final for fire alarm and fire sprinkler permits, provide ADA compliant hardware for Riser Room door, repair exit sign and get approval for the missing fire hydrant at the corner of Fairview and Cole (plans show existing on corner)
screened // Tom Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/31/2020 | 3/31/2020 | 3/31/2020 | P | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | PASS |
Mike Jordan
|
|
|
scott Phone #: ###-####. Interior steel stud framed walls ok.
|
BLD-Energy code compliance | 1/17/2020 | 1/17/2020 | 1/17/2020 | P | PASS |
Mike Jordan
|
|
|
Scott Phone #: ###-####
|
BLD-Energy code compliance | 1/13/2020 | 1/13/2020 | 1/13/2020 | P | CANC |
Mike Jordan
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 1/13/2020 | 1/13/2020 | 1/13/2020 | P | PASS |
Mike Jordan
|
|
|
Scott Phone #: ###-####. exterior wood framed walls only ok to insulate.
|
BLD-Other | 12/16/2019 | 12/16/2019 | 12/16/2019 | P | PASS |
Mike Jordan
|
|
|
roof nailing - Scott Phone #: ###-####
|
BLD-Wall Bracing | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Wall Bracing | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | NR |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Moved to pm. inspection.
|
BLD-Other | 12/2/2019 | 12/3/2019 | 12/3/2019 | P | DONE |
Mike Jordan
|
|
|
slab on grade // Scott Phone #: ###-####
|
BLD-Foundation | 11/5/2019 | 11/5/2019 | 11/5/2019 | P | PASS |
Mike Jordan
|
|
|
Scott Phone #: ###-####
|
BLD-Foundation | 10/29/2019 | 10/30/2019 | 10/30/2019 | P | CANC |
Mike Jordan
|
|
|
rebar// scott Phone #: ###-####
|
BLD-Footing | 10/25/2019 | 10/28/2019 | 10/28/2019 | A | PART |
Mike Jordan
|
|
|
rebar // Scott Phone #: ###-####. Permiter footing. Work in progress. Will have special inspection. will need concrete blankets due to cold temps. Ok to place concrete pending special inspection.
|