Permit Information
Permit NumberBLD19-03042
StatusIssued
Name BARROW DESIGN & CONSTRUCTION LLC
Site Address 1105 N LIBERTY ST
Project NameLiberty Lake Clubhouse
Customer Number 
ePlanReviewYes
Description
(LIBERTY LAKE CLUBHOUSE) **This building has a fire alarm system FIR01-00205** Permit is to remodel an existing 4,297 sq. ft. clubhouse assembly building and a new 118 sq. ft. entry foyer addition. Approval is contingent upon adhering to the approved plans on file, plan review report and attached engineering. Work to include: removal of select exterior concrete sidewalk, removal of exterior column furring, removal of select exterior walls, removal of select exterior and interior door/doorframe, removal of select exterior and interior windows, removal of exterior brick wainscot and select vinyl finishes, removal of select interior nonbearing walls, removal of select millwork, removal of select floor finish, removal of select exterior and interior ceiling, construction of interior non-bearing walls to create, select new interior concrete slab and exterior concrete sidewalk, select new concrete footing, framing, select new column furring, select new exterior doors and windows, new exterior stone and stucco finish, select new interior wall infill, select new millwork, select new gypsum ceiling, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. Note: Special inspection required, see 310 form attached. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in8/7/20208/10/20208/10/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by robert barrow
BLD-Conference7/31/20208/3/20208/3/2020PDONE
DetailsMike Jordan
Bob *screened* Phone #: ###-####
BLD-Footing6/30/20207/1/20207/1/2020APEND
DetailsMike Jordan
bob Phone #: ###-####. Engineer to sign off on epoxy, no special inspection. Aslo need RFI for column pad footings and aditional letter from engineer waiving special inspection on concrete.