BLD-Energy code compliance | 8/7/2020 | 8/10/2020 | 8/10/2020 | A | PASS |
Brandon Shaw
|
|
|
late morning- Dave *screened* Phone #: ###-####
|
BLD-Framing/Rough-in | 8/6/2020 | 8/7/2020 | 8/7/2020 | P | PASS |
Tell Riley
|
|
|
Dave - */Screened*/ Phone #: ###-####//ok to insulate//
|
BLD-Framing/Rough-in | 8/5/2020 | 8/6/2020 | 8/6/2020 | P | FAIL |
Tell Riley
|
|
|
Dave - */Screened*/ Phone #: ###-####//need to add nails to hangers//see truss docs for 2 ply girder nailing//CN posted//permit details show required plumbing and mechanical permits, they have not been issued or inspected//
|
BLD-Foundation | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | PART |
Tell Riley
|
|
|
rebar // Dave ...... screened Phone #: ###-####//WIP//pend all special inspections//
|
BLD-Footing | 6/23/2020 | 6/24/2020 | 6/24/2020 | A | PART |
Tell Riley
|
|
|
Screened // as late as possible .....Dave Phone #: ###-####//contractor stated building was marked in place prior to demo, new building is lined based on those markings//appears to meet the site plan, in line with drawings for existing water piping and plumbing//footings per plans//pending all special inspections that are required//
|