BLD-Foundation | 9/15/2019 | 9/16/2019 | 9/16/2019 | P | PART |
Tell Riley
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell //wall partialy set//WIP//
|
BLD-Footing | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PART |
Tell Riley
|
|
|
Dion Phone #: ###-####//need to add rebar on north side per engineering detail// west setback--pier footings will not meet 5 foot setbacks per zoning///ok to pour areas not in conflict with setbacks//
|
BLD-Footing | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | FAIL |
Tell Riley
|
|
|
Setbacks will need to be approved by zoning--plans show 8 foot eastside setback measures roughly 6 foot 4 inches//please establish west propert line to verify setbacks//rebar will need to be installed and tied per engineering//call for re-inspection//
|
BLD-Footing | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | DEFR |
Mike Jordan
|
|
|
Dion Phone #: ###-####
|