Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD19-03112
StatusIssued
Name CULPAN & COMPANY
Site Address 4329 N EYRIE WAY
Project NameZURLO RESIDENCE
Customer Number 
ePlanReviewYes
Description
**PLAN MODIFICATION 03-30-20 Updates to foundation and framing as well as floor plan changes. JJN** **PLAN MODIFICATION 02-13-20 - changes to foundation. Updating grading and drainage and ESC. JJN** **HILLSIDE** **W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED** **PASSES USING UA TRADE OFF** Permit for the construction of a new 3602 sq. ft., two story single family dwelling 2034 sq ft. and below grade 1568 sq. ft. with 4 bedrooms, 3.5 bathrooms, approximately 630 sq ft covered patio and a 844 sq. ft. attached garage per the approved plans and any notations. A-1 zoning and setbacks per planning. JJN ***SPRINKLERS ARE NOT REQUIRED***LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance7/14/20207/15/20207/15/2020PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clive Culpan
BLD-Framing/Rough-in7/1/20207/2/20207/2/2020PPASS
DetailsTony Young
Clye *screened* Phone #: ###-####// wall bracing ok also,, straps added,, ok to insulate
BLD-Wall Bracing6/10/20206/11/20206/11/2020APEND
DetailsTony Young
Wade; Phone #: ###-####// waiting on letter of ok from engineer on deleting the straps
BLD-Wall Bracing6/10/20206/10/20206/10/2020PNR
DetailsTony Young
Wade; Phone #: ###-####
BLD-Wall Bracing6/8/20206/9/20206/9/2020ANR
DetailsTony Young
Wade Phone #: ###-####// need to nail/ strap per plan
BLD-Foundation4/7/20204/7/20204/7/2020PPART
DetailsTony Young
Chris; Phone #: ###-####,, work in progress,, ok
BLD-Footing4/3/20204/3/20204/3/2020PPART
DetailsTony Young
cleared - crawlspace and garage // Chris Phone #: ###-####,, work in progress,, ok
BLD-Foundation3/20/20203/23/20203/23/2020APART
DetailsTell Riley
Chris Phone #: ###-#### or ###-####//basement area walls only--footings already poured//not part of the plan mod//
BLD-Footing3/12/20203/13/20203/13/2020APASS
DetailsDave Hannah
Chris Phone #: ###-####
BLD-Footing3/11/20203/12/20203/12/2020ANR
DetailsMike Jordan
Chris Phone #: ###-####. Needs geo tech report submitted and approved.