Permit Information
Permit NumberBLD19-03187
StatusIssued
Name C & T CONSTRUCTION
Site Address 7737 W CRESTWOOD DR
Project Name15B.2
Customer NumberBLD19-03180-003181 & BLD19-03188
ePlanReviewNo
Description
***02/18/20 PLAN MODIFICATION TO UPDATE 2 HOUR WALL*** (FOUR PERMITS FILED) Permit for the construction of a new 1589 sq. ft., 3 story (first story 189 sq. ft., second story 750 sq. ft. and third story 650 Sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 45 sq. ft. of covered patio/porch and a 450 sq. ft. attached garage per the approved plans and any notations. C-1D zoning and setbacks per planning. RDP ***SPRINKLERS NOT REQUIRED*** LGM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance5/28/20205/28/20205/28/2020PPASS
DetailsTell Riley
corrections made//
BLD-Energy code compliance5/27/20205/27/20205/27/2020APART
DetailsTell Riley
Inspection requested via web by Carl Funk//add hangers to area above stairs as discussed//add VB at areas discussed//add truss bracing//add r20 min inuslation in areas r19 was installed//framing that is different than plans is in accordance with engineers site walk though and accepted by him on the first eight units, same framing used on this unit//
BLD-Framing/Rough-in5/22/20205/22/20205/22/2020APART
DetailsTell Riley
Inspection requested via web by Carl Funk//ok to insulate only//add stud for 2nd floor bearing at stairs marked in green//need joist repair//add truss bracing//address head height at stairs//
BLD-Framing/Rough-in5/21/20205/21/20205/21/2020ANR
DetailsTell Riley
Inspection requested via web by Carl Funk//see Joey onsite for corrections list//framing that differs on plans, appears to meet engineers onsite walk through as per the other units//need truss plans on next inspection//also see green marks on plans and in buildings//
BLD-Wall Bracing5/14/20205/14/20205/14/2020PPASS
DetailsTell Riley
Inspection requested via web by Carl Funk//interior shear on fire wall//screws/ nails ok per plans, compliant with engineers email stating blocking is not needed at edges//still need rating for ele heater box in rated wall//
BLD-Wall Bracing5/13/20205/13/20205/13/2020PFAIL
DetailsTell Riley
Firewall shear Inspection requested via web by Carl Funk//Not ready, not all walls hung, nailing needs to be done at all plates//still need verifiction of ele heater boxes in firewall//
BLD-Wall Bracing5/12/20205/12/20205/12/2020PCANC
DetailsTell Riley
Firewall Shear Inspection requested via web by Carl Funk
BLD-Energy code compliance5/7/20205/8/20205/8/2020APART
DetailsTell Riley
Firewall insulation Inspection requested via web by Carl Funk//fire separation walls only//per plans//
BLD-Framing/Rough-in5/7/20205/8/20205/8/2020APART
DetailsTell Riley
Fireblocking Inspection requested via web by Carl Funk//fire separation wall only//Corrections made//need rating information for ele heater box in rated wall(all Units)//
BLD-Framing/Rough-in5/7/20205/7/20205/7/2020AFAIL
DetailsTell Riley
Fire blocking firewall Inspection requested via web by Carl Funk/framing for fire walls ONLY//add nuts and bolts in areas noted//add studs in areas noted//add fire blocking in areas noted//see details for truss connections at fire walls//complete air seal//
BLD-Energy code compliance5/7/20205/7/20205/7/2020ANR
DetailsTell Riley
Insulation firewall Inspection requested via web by Carl Funk
BLD-Energy code compliance5/5/20205/5/20205/5/2020ANR
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk/needs framing inspeciton completed on separation walls prior to insulation//will reschedule when insulation is removed//
BLD-Wall Bracing3/19/20203/20/20203/20/2020APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk
BLD-Wall Bracing3/16/20203/17/20203/17/2020AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//need to add nails, fix hold downs nails//did walk through with carl//add hold downs where needed//
BLD-Foundation12/13/201912/13/201912/13/2019PPART
DetailsTell Riley
Gibert Phone #: ###-####//WIP//still need to install hold downs//
BLD-Footing12/10/201912/11/201912/11/2019APASS
DetailsTell Riley
GILBERT Phone #: ###-####//ok per details and survey, site plan//