BLD-Energy code compliance | 5/28/2020 | 5/28/2020 | 5/28/2020 | P | PASS |
Tell Riley
|
|
|
corrections made//
|
BLD-Energy code compliance | 5/27/2020 | 5/27/2020 | 5/27/2020 | A | PART |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk//add hangers to area above stairs as discussed//add VB at areas discussed//add truss bracing//add r20 min inuslation in areas r19 was installed//framing that is different than plans is in accordance with engineers site walk though and accepted by him on the first eight units, same framing used on this unit//
|
BLD-Framing/Rough-in | 5/22/2020 | 5/22/2020 | 5/22/2020 | A | PART |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk//ok to insulate only//add stud for 2nd floor bearing at stairs marked in green//need joist repair//add truss bracing//address head height at stairs//
|
BLD-Framing/Rough-in | 5/21/2020 | 5/21/2020 | 5/21/2020 | A | NR |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk//see Joey onsite for corrections list//framing that differs on plans, appears to meet engineers onsite walk through as per the other units//need truss plans on next inspection//also see green marks on plans and in buildings//
|
BLD-Wall Bracing | 5/14/2020 | 5/14/2020 | 5/14/2020 | P | PASS |
Tell Riley
|
|
|
Inspection requested via web by Carl Funk//interior shear on fire wall//screws/ nails ok per plans, compliant with engineers email stating blocking is not needed at edges//still need rating for ele heater box in rated wall//
|
BLD-Wall Bracing | 5/13/2020 | 5/13/2020 | 5/13/2020 | P | FAIL |
Tell Riley
|
|
|
Firewall shear Inspection requested via web by Carl Funk//Not ready, not all walls hung, nailing needs to be done at all plates//still need verifiction of ele heater boxes in firewall//
|
BLD-Wall Bracing | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | CANC |
Tell Riley
|
|
|
Firewall Shear Inspection requested via web by Carl Funk
|
BLD-Energy code compliance | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PART |
Tell Riley
|
|
|
Firewall insulation Inspection requested via web by Carl Funk//fire separation walls only//per plans//
|
BLD-Framing/Rough-in | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PART |
Tell Riley
|
|
|
Fireblocking Inspection requested via web by Carl Funk//fire separation wall only//Corrections made//need rating information for ele heater box in rated wall(all Units)//
|
BLD-Framing/Rough-in | 5/7/2020 | 5/7/2020 | 5/7/2020 | A | FAIL |
Tell Riley
|
|
|
Fire blocking firewall Inspection requested via web by Carl Funk/framing for fire walls ONLY//add nuts and bolts in areas noted//add studs in areas noted//add fire blocking in areas noted//see details for truss connections at fire walls//complete air seal//
|
BLD-Energy code compliance | 5/7/2020 | 5/7/2020 | 5/7/2020 | A | NR |
Tell Riley
|
|
|
Insulation firewall Inspection requested via web by Carl Funk
|
BLD-Energy code compliance | 5/5/2020 | 5/5/2020 | 5/5/2020 | A | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk/needs framing inspeciton completed on separation walls prior to insulation//will reschedule when insulation is removed//
|
BLD-Wall Bracing | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk
|
BLD-Wall Bracing | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//need to add nails, fix hold downs nails//did walk through with carl//add hold downs where needed//
|
BLD-Foundation | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | PART |
Tell Riley
|
|
|
Gibert Phone #: ###-####//WIP//still need to install hold downs//
|
BLD-Footing | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | PASS |
Tell Riley
|
|
|
GILBERT Phone #: ###-####//ok per details and survey, site plan//
|