BLD-Energy code compliance | 4/1/2020 | 4/2/2020 | 4/2/2020 | P | PASS |
Tell Riley
|
|
|
Tell can you text me your Email address so I can send you the engineering on the floor joist and also from Kolby Thanks Carl Phone #: ###-#### Inspection requested via web by Carl Funk//framing corrections noted, framing was walked through with design engineer, noted changes were approved by engineer//joist were ok per LP engineer//insulation ok//
|
BLD-Framing/Rough-in | 3/29/2020 | 3/30/2020 | 3/30/2020 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk////see corrections prior to any cover approval//need letter from engineer//ok to insulate//
|
BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 | A | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//used as conference with engineer of record and contractor//some engineering will need to be completed and corrections made in framing//need I joist manual for plumbing in Is//need truss engineering//
|
BLD-Framing/Rough-in | 3/26/2020 | 3/26/2020 | 3/26/2020 | P | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk
|
BLD-Wall Bracing | 3/13/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Tell Riley
|
|
|
Sheetrock fire walls Phone #: ###-#### Inspection requested via web by Carl Funk
|
BLD-Wall Bracing | 3/11/2020 | 3/11/2020 | 3/11/2020 | P | CANC |
Tell Riley
|
|
|
Firewall bracing with email from Engineer Phone #: ###-#### Inspection requested via web by Carl Funk
|
BLD-Wall cover | 2/23/2020 | 2/24/2020 | 2/24/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk// rated separation walls only//blocking added at floor//insualtion needs to be R20 at exterior 2x8 rated walls//some insulation has fallen, would like to see as drywall is installed//
|
BLD-Wall cover | 2/20/2020 | 2/20/2020 | 2/20/2020 | A | NR |
Tell Riley
|
|
|
Call me on your way please Phone #: ###-#### Inspection requested via web by Carl Funk//still working on ELE// need to fix insulation//address fireblocking issue with Architect//remove siding in center unit to install 2 layers of 5/8 per detail//
|
BLD-Wall cover | 2/5/2020 | 2/5/2020 | 2/5/2020 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//CN posted//does not meet requirements for 2 hr assembly per plans//
|
BLD-Wall cover | 1/31/2020 | 2/3/2020 | 2/3/2020 | A | CANC |
Tell Riley
|
|
|
Phone #: ###-#### firewall Inspection requested via web by Carl Funk
|
BLD-Wall cover | 1/30/2020 | 1/31/2020 | 1/31/2020 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk/ needs plans
|
BLD-Wall Bracing | 1/30/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk,, exterior ok
|
BLD-Wall Bracing | 1/29/2020 | 1/29/2020 | 1/29/2020 | A | FAIL |
Tell Riley
|
|
|
Tell I know I have to move two of the decks back. Have not done it yet. One has to move a couple of inches and another has to move about 12 inches. The property lines are on the other side of the fence about 18 inches on the west side of the property. We did not build the fence on the property line because it was to close to the canal. Let me know when you are gonna be there and I will meet you. Thanks Carl Phone #: ###-#### Inspection requested via web by Carl Funk/See red marks for corrections,straps, and nailing//
|
BLD-Wall Bracing | 1/7/2020 | 1/8/2020 | 1/8/2020 | P | FAIL |
Tell Riley
|
|
|
Call Framer Yurguen Robelero ###-#### when you are on your way so he can meet you. Thanks Carl Phone #: ###-#### Inspection requested via web by Carl Funk//CN posted//need to finish shear areas on back wall//need to meet rear setbacks per plans at decks//
|
BLD-Wall Bracing | 12/16/2019 | 12/16/2019 | 12/16/2019 | A | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//used inspection as conference//
|
BLD-Foundation | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | PART |
Tell Riley
|
|
|
Cergo Phone #: ###-####//WIP//need to install hold downs//
|
BLD-Footing | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | PART |
Tell Riley
|
|
|
Sergio Phone #: ###-####//rebar ok//maintain 15 ft rear setback when porch piers are setup--not yet set///
|