Information based on query as of Sunday, June 2, 2024.
Permit Information
Permit NumberBLD19-03342
StatusTemporary Occupancy
Name CM COMPANY
Site Address 555 E PARKCENTER BLVD
Project NameDelta Dental - Building A/B
Customer NumberBLD19-04140
ePlanReviewYes
Description
(DELTA DENTAL OF IDAHO – BUILDING A/B - BUILDING REMODEL AND ADDITION) (DRH19-00054) (2-26-20 PLAN MODIFICATION TO ADD A NATURAL GAS STANDBY GENERATOR ON SITE TO PROVIDE POWER IN THE EVENT OF A POWER OUTAGE FROM THE PUBLIC UTILITY. WORK IS TO INCLUDE A 24 FEET 8 INCHES BY 15 FEET 4 INCHES, 10 FOOT TALL MASONRY FENCE ENCLOSURE OPEN TO THE SKY WITH STEEL GATES TO MATCH THE TRASH ENCLOSURE PREVIOUSLY APPROVED, A CONCRETE SLAB ON GRADE WITHIN THE GENERATOR ENCLOSURE, AN UNDERGROUND CONDUITS AND ELECTRICAL CABLES, A TRANSFER SWITCH, GROUNDING SYSTEMS, A RELOCATED SIDEWALK, EXPANDED PARKING LOT WITH ADDED PARKING SPACES AND REDUCED LANDSCAPING, ETC.) The fire sprinkler system is used for building area increase, for fire flow, and for code trade-offs. To remodel an existing 11,586 square foot building (“Building A”) and to construct a 13,638 square foot building addition (“Building B”). The two “buildings” are considered to be one building because the circulation structure that connects the two “buildings” does not comply as a pedestrian walkway. For the remodel to the existing 11,586 square foot building (i.e. “Building A”), work is to include interior nonbearing walls, remodeled restrooms, a new single-user toilet room, interior doors, interior windows, suspended acoustical ceilings, gypsum board ceilings and soffits, millwork, and finishes. A new vestibule addition and roof feature addition will be constructed. Aluminum composite panels and metal fascia will be used as the exterior finishes for the additions. For the 13,638 square foot building addition (i.e. “Building B”), work is to include concrete footings, concrete foundations, concrete slab on grade, steel columns, masonry exterior walls, precast concrete walls, exterior wood stud bearing and shear walls, exterior stucco, CMU veneer, metal fascia, aluminum composite panels, expansion joint between “buildings”, wood truss roof, wood roof beams, metal awnings, roof top equipment screens, rigid insulation installed on top of the roof deck, membrane roof covering, exterior doors and windows, interior nonbearing walls, two toilet/shower rooms accessible to the disabled, interior doors, interior windows, suspended acoustical ceilings, gypsum board ceilings and soffits, millwork, and finishes. Special Inspection is required for soils, welding, bolting, and anchors post-installed in hardened concrete. A masonry trash enclosure with steel gates and steel fences with steel gates will also be constructed. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Alarm Testing7/2/20207/2/20207/8/2020PDONE
DetailsJim Page
Alarm testing and life safety completed for phase 1 completed on 02JULY2020.

Fire Alarm couldn''t get their inspection in until pm today so I''m moving this inspection from am to pm. ALso, Fire sprinkler and Structural are scheduled for PM as well Phone #: ###-#### Inspection requested via web by Brandon Reynolds
BLD-Final7/2/20207/2/20207/2/2020PPART
DetailsBrandon Shaw
Phase I complete, TCO is approved...
FIRE-Final Inspection7/2/20207/2/20207/2/2020PPART
DetailsJim Page
Fire sprinkler and fire alarm inspections for TCO phase 1 complete, fire extinguishers for phase 1 are placed. Final life fire safety inspection for TCO phase 1 complete, signatures provided on temporary line for phase 1.

Fire Alarm couldn''t get their inspection in until pm today so I''m moving this inspection from am to pm. ALso, Fire sprinkler and Structural are scheduled for PM as well Phone #: ###-#### Inspection requested via web by Brandon Reynolds
BLD-Final7/1/20207/2/20207/2/2020PCANC
DetailsBrandon Shaw
Buidling B final See phasing plan approved by the city on 6-15 Call when on site Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
FIRE-Final Inspection7/1/20207/2/20207/2/2020ACANC
DetailsJim Page
Building B fire sprinkler final See approved phasing plan approved by the city on 6-15 Call Brandon when on site Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
BLD-Grading Inspection6/30/20207/1/20207/1/2020ACANC
DetailsBrandon Shaw
This is inspection for TCO for Building B. Landscaping will be completed in phase 2 as submitted and apporved in the phasing plan on 6-15. All ADA stalls are striped and sidewalk is in Phone #: ###-#### Inspection requested via web by Brandon Reynolds
FIRE-Final Inspection6/30/20207/1/20207/1/2020PCANC
DetailsTroy Cobbley
This is Fire Life Safety inspection for Building B Phase 1 as shown on the phasing plan. Phasing Plan was submitted, reviewed and approved on 6-15. We would like to have this inspection done after 3pm but realize requesting a time is not garaunteed. Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
BLD-Ceiling Grid Inspection6/15/20206/16/20206/16/2020APASS
DetailsJim Storey
See Phasing plan approved by plan review in agency comments section. Ceiling grid inspection for building B. Inspection for cover at ceiling grid. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
BLD-Energy code compliance4/20/20204/20/20204/20/2020PPASS
DetailsBrandon Shaw
Brandon Reynolds I''m back from Vaca and see only a partial on energy code compliance. Jimmie was on site last and I''m not sure what got inspected and what didn''t. Drywallers are here and hanging one side. Please give me a call when on site and we can verbally review. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
BLD-Wall cover4/20/20204/20/20204/20/2020PCANC
DetailsBrandon Shaw
Looking for approval to cover walls both sides. All MEP inspections are complete. Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
BLD-Energy code compliance3/27/20203/30/20203/30/2020APART
DetailsBrandon Shaw
Building B Exterior Wall Insulation Inspection for Energy code compliance.
BLD-Wall cover3/19/20203/20/20203/20/2020PPASS
DetailsJim Storey
Inspection to cover one side of walls in building B. Phone #: ###-#### Inspection requested via web by Jimmie Miller interior walls only
BLD-Wall cover3/17/20203/19/20203/19/2020PDEFR
DetailsJim Storey
Inspection to cover one side of walls in building B. Phone #: ###-#### Inspection requested via web by Jimmie Miller
BLD-Framing/Rough-in3/12/20203/16/20203/16/2020PPART
DetailsBrandon Shaw
Nailing inspeciton on Ped walkway between building B and A. I dont believe it''s a shearwall but we''ll want to make sure inspector doesn''t want to see roof or walls before they are covered with roofing and stucco Phone #: ###-#### Inspection requested via web by Brandon Reynolds
BLD-Wall cover3/11/20203/17/20203/12/2020PCANC
DetailsBrandon Shaw
Framing interior wall inspection for cover. Building B Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
BLD-Framing/Rough-in3/3/20203/3/20203/3/2020PPART
DetailsBrandon Shaw
This is to inspect the walls and roof which werent complete the last time Brandon was on site. Inpsect walls, Nail pattern and holdowns on walls and roof from Grid 3, East.
BLD-Framing/Rough-in2/13/20202/14/20202/14/2020APART
DetailsBrandon Shaw
No framing, exterior shear...
Ok to cover, see plans fot area inspected...
BLD-Framing/Rough-in2/12/20202/13/20202/13/2020PCANC
DetailsJim Storey
CANCEL ON 2-13-20 AND RESC Brandon Phone #: ###-####
BLD-Conference1/31/20202/6/20202/5/2020ACANC
DetailsBrandon Shaw
Requesting to meet with electrical, building and fire life saety inspectors at 10am to review building Occupency plan. On site. Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
FIRE-Conference1/31/20202/6/20202/5/2020ACANC
DetailsJim Page
Requesting to meet with electrical, building and fire life saety inspectors at 10am to review building Occupency plan. On site. Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
BLD-Foundation12/9/201912/10/201912/10/2019APASS
DetailsBrandon Shaw
Pending special inspection...
Work in progress...
BLD-Footing11/27/201912/2/201912/2/2019APART
DetailsBrandon Shaw
Pending special inspection...
Work in progress...