BLD-Final | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | PASS |
Mike Jordan
|
|
|
Screened- Sam Phone #: ###-####
|
BLD-Blower Door Test Results | 4/7/2020 | 4/7/2020 | 4/7/2020 | A | DONE |
Mike Jordan
|
|
|
4.6
|
DOC - Permit Finaled | 4/7/2020 | 4/7/2020 | 4/7/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Framing/Rough-in | 1/15/2020 | 1/16/2020 | 1/16/2020 | A | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####. All framing correction have been made. Ok to insulate.
|
BLD-Framing/Rough-in | 1/13/2020 | 1/13/2020 | 1/13/2020 | P | FAIL |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Complete lateral bracing on F04 and A02 trusses. Fireblock either side of archway in hall and concelled space at ceiling next to archway. Strap double top plate break at beam seat from beam in garage. Install the 4 simpson screws into each stud for the 2x12 ledger connection. Anchor bolts required for the interior bearing wall in garage. Did the inteior thickend footing get placed with slab? Correction notice posted. Ok to insulate.
|
BLD-Wall Bracing | 12/11/2019 | 12/12/2019 | 12/12/2019 | A | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Foundation | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | CANC |
Mike Jordan
|
|
|
pour at 1:30 // SAm Phone #: ###-####
|
BLD-Footing | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PASS |
Mike Jordan
|
|
|
pour at 1:30 // SAm Phone #: ###-####
|
BLD-Footing | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | FAIL |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Column pad footings not the min. 10 inches deep per the approved plans. Also noted that ground, rebar and form work below the min. 34 degress required for concrete placement.
|