BLD-Final | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | DONE |
Tell Riley
|
|
|
Larry Phone #: ###-####//final complete per the scope of work//demo of walls and plumbing, cabinets etc//the hot water heater is not installed, and a half bath remains//no living space, kitchen or full bath was present at time of inspection//Electrical work was inspected and passed//
|
DOC - Permit Finaled | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 1/28/2020 | 1/29/2020 | 1/29/2020 | P | NR |
Tell Riley
|
|
|
Larry Phone #: ###-####//still needs electrical permit, talked with Daryl, and any electrical termination, demo, or changes require a permit//
|
BLD-Final | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | NR |
Tell Riley
|
|
|
Larry Phone #: ###-####//will need to get electrical permit and final inspection prior to building final//plumbing removed will need to be capped//if bathroom is allowed to stay, scope of permit needs to be updated, as there is no indication of approval for bathroom to stay in garage//
|