BLD-Final | 7/13/2020 | 7/16/2020 | 7/16/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 7/16/2020 | 7/16/2020 | 7/16/2020 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 7/13/2020 | 7/13/2020 | 7/13/2020 | P | PASS |
Mike Jordan
|
|
|
4 (This activity was added in error so we have changed the case status back to Issued.)
|
BLD-Final | 7/6/2020 | 7/13/2020 | 7/13/2020 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall. Handrail does not extend to first or last riser. Everything else ok. (This activity was added in error so we have changed the case status back to Issued.)
|
BLD-Blower Door Test Results | 7/6/2020 | 7/13/2020 | 7/13/2020 | A | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Energy code compliance | 4/29/2020 | 5/6/2020 | 5/6/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/29/2020 | 5/4/2020 | 5/4/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 3/27/2020 | 3/27/2020 | 3/27/2020 | P | PART |
Tell Riley
|
|
|
Jorge Phone #: ###-####//need to add hot dip galvanized nails to pt//add blocking///add straps on 2nd story//
|
BLD-Wall Bracing | 3/26/2020 | 3/26/2020 | 3/26/2020 | P | CANC |
Jim Storey
|
|
|
jorge Phone #: ###-#### fee not paided
|
BLD-Wall Bracing | 3/25/2020 | 3/25/2020 | 3/25/2020 | P | CANC |
Mike Jordan
|
|
|
jorge Phone #: ###-####086
|
BLD-Wall Bracing | 3/24/2020 | 3/25/2020 | 3/25/2020 | A | FAIL |
Mike Jordan
|
|
|
Jorge Phone #: ###-####. No city approved plans on site. reinspection fee issued.
|
BLD-Foundation | 12/10/2019 | 12/10/2019 | 12/10/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Edgar Sanchez
|
BLD-Footing | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|