BLD-Conference | 8/3/2020 | 8/10/2020 | 8/10/2020 | A | DONE |
Tell Riley
|
|
|
application for addition was received and is under reveiw//
|
BLD-Conference | 7/27/2020 | 8/3/2020 | 8/3/2020 | A | DONE |
Tell Riley
|
|
|
another correction notice issued as I do not see where plan modification has been submitted/recieved on PDS//follow up 5 days//
|
BLD-Aging Inspection | 7/22/2020 | 7/22/2020 | 7/28/2020 | | PEND |
Tell Riley
|
|
|
see enty from 7/27/2020, needs permit for addition and exterior deck//
|
BLD-Conference | 7/20/2020 | 7/27/2020 | 7/27/2020 | A | DONE |
Tell Riley
|
|
|
follow up on addition to home without proper permits////talekd with Asaad, he has made contact for plan modificaton requirements// on the phone he stated he would be submitting the plan mdoification//let him know it needs to be completed prior to continuing any work//follow up 5 days//
|
BLD-Aging Inspection | 7/21/2020 | 7/21/2020 | 7/22/2020 | | PEND |
Tell Riley
|
|
|
Cn notice issued earlier this week for an adition on the front and porch added on the back//no permits are issued or plan modifications approved for such work//follow up will be completed on Monday//
|
BLD-Conference | 7/20/2020 | 7/20/2020 | 7/20/2020 | A | DONE |
Tell Riley
|
|
|
neighbor texted about work on exterior of home, permit is for interior remodel//CN issued for addition to front of home and deck being constructed in back//permit is for interior remodel only//also Electrical permit is required//follow up in 5 days//
|
BLD-Conference | 1/9/2020 | 1/9/2020 | 1/9/2020 | A | DONE |
Tell Riley
|
|
|
Per Matt, check floor for structural at access in master bathroom, cut access indicates floor is sagging//
|