BLD-Final | 6/2/2020 | 6/2/2020 | 6/2/2020 | P | PASS |
Tony Young
|
|
|
Erik Phone #: ###-####
|
DOC - Permit Finaled | 6/2/2020 | 6/2/2020 | 6/2/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Wall cover | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | PASS |
Brandon Shaw
|
|
|
Corrections are SAT... Insulate inspection...
|
BLD-Final | 3/10/2020 | 3/11/2020 | 3/11/2020 | A | CANC |
Mike Jordan
|
|
|
Please call 15 minutes prior so I can be there. Wall seal complete. Framing corrections complete Phone #: ###-#### Inspection requested via web by Erik Hagen
|
BLD-Framing/Rough-in | 3/11/2020 | 3/11/2020 | 3/11/2020 | A | PART |
Mike Jordan
|
|
|
Please call 15 minutes prior so I can be there. Wall seal complete. Framing corrections complete Phone #: ###-#### Inspection requested via web by Erik Hagen. All previous correction items have been repaired. Ok to foam spray exterior walls and under roof deck. Noted several areas that need fireblocked. Contractor noted that he will have these areas addresed for energy code inspection.
|
BLD-Framing/Rough-in | 3/10/2020 | 3/10/2020 | 3/10/2020 | P | PEND |
Tony Young
|
|
|
Please call 15 minutes prior so I can be there. Wall seal complete. Framing corrections complete Phone #: ###-#### Inspection requested via web by Erik Hagen/// needs mech. pass 1st,, ok to start spray foaming unaffected areas of mechanical and frame corrections
|
BLD-Framing/Rough-in | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | NR |
Tony Young
|
|
|
Please call 15 minutes prior so I can be there. Wall seal complete. Framing corrections complete Phone #: ###-#### Inspection requested via web by Erik Hagen// needs mechanical rough in pass 1st
|
BLD-Conference | 3/5/2020 | 3/6/2020 | 3/5/2020 | A | CANC |
Tony Young
|
|
|
Please call 310.755.5987 10 minutes prior to arrival. Preliminary items from Tuesday meeting addressed by framer. Ready for re-inspection of framing in preparation for spray foam insulation next week. Phone #: ###-#### >> Inspection requested via web by Erik Hagen Inspection cancelled from web by: Erik Hagen
|
BLD-Conference | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | PART |
Tony Young
|
|
|
Please call Erik @ 310.755.5987 15 minutes in advance so I can be there. This is for Framing inspection prior to insulating. Phone #: ###-#### Inspection requested via web by Erik Hagen/// frame walk through,, fire blocking,, joist connections,, header support,, trades,, etc.
|
BLD-Footing | 1/20/2020 | 1/21/2020 | 1/21/2020 | A | PART |
Tony Young
|
|
|
Second set of rebar for footings. Contractor (Alex Katan) will be on site. Phone #: ###-#### Inspection requested via web by Erik Hagen// work in progress,, ok
|
BLD-Footing | 1/15/2020 | 1/16/2020 | 1/16/2020 | A | PART |
Dave Hannah
|
|
|
Please call 15 minutes prior so that we can ensure access and that we will be there. Rebar for footings again. They had the rebar in place today. The contractor will be there tomorrow morning 1/16 as well to go over their process as the concrete will be placed in phases and will affect the rebar placement. Phone #: ###-#### Inspection requested via web by Erik Hagen first set of ftgs under ext basement walls ok
|
BLD-Footing | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | NR |
Dave Hannah
|
|
|
Rebar rescheduled from Monday. Call me before. Phone #: ###-#### Inspection requested via web by Erik Hagen
|
BLD-Footing | 1/10/2020 | 1/13/2020 | 1/13/2020 | P | CANC |
Tony Young
|
|
|
Partial rebar install for new basement edge of slab turn up/down under existing stem wall. Phone #: ###-#### >> Inspection requested via web by Erik Hagen Inspection cancelled from web by: Erik Hagen
|
BLD-Conference | 11/12/2019 | 11/13/2019 | 11/13/2019 | A | PART |
Tony Young
|
|
|
Haygen- please call before Phone #: ###-####,, ?s about basement slab.. walls without footings,, need to have engineer design or approve of a fix..
|
BLD-Final | 10/25/2019 | 10/28/2019 | 10/28/2019 | A | CANC |
Dave Hannah
|
|
|
call to meet // Erik Phone #: ###-####
|