BLD-Aging Inspection | 4/2/2020 | 4/2/2020 | 4/9/2020 | | PEND |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | PASS |
Tell Riley
|
|
|
Ed Phone #: ###-####//corrections made//shear nailed and stapled//
|
BLD-Framing/Rough-in | 11/18/2019 | 11/19/2019 | 11/19/2019 | A | FAIL |
Tell Riley
|
|
|
Ed Phone #: ###-####//need to add nails for shear or provide staple conversion per engineer//add A35s per notes by engineer//
|
BLD-Framing/Rough-in | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | FAIL |
Tell Riley
|
|
|
Ed Phone #: ###-####//remove wrap for shear inspection//expose wall sill plates for anchor bolt inspection//add kings stud per details//add A35 per details//sthd14s needed at all location noted on plans//CN posted//
|
BLD-Footing | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Tell Riley
|
|
|
Ed Phone #: ###-####//ok per approved plans//wall and footing//
|