BLD-Final | 5/1/2020 | 5/1/2020 | 5/1/2020 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by justin reynolds
|
DOC - Permit Finaled | 5/1/2020 | 5/1/2020 | 5/1/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 5/1/2020 | 5/1/2020 | 5/1/2020 | P | DONE |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by justin reynolds 4.2
|
BLD-Final | 4/29/2020 | 4/29/2020 | 4/29/2020 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by justin reynolds mech to sign off// blower door test. inside ok.
|
BLD-Final | 4/28/2020 | 4/29/2020 | 4/29/2020 | A | DEFR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by justin reynolds
|
BLD-Framing/Rough-in | 2/10/2020 | 2/10/2020 | 2/10/2020 | P | PASS |
Jim Storey
|
|
|
c/n made ok
|
BLD-Energy code compliance | 2/7/2020 | 2/10/2020 | 2/10/2020 | A | NR |
Jim Storey
|
|
|
Justin Phone #: ###-#### // need to check 2 locations for framing corections ok to begin sheet rock.301
|
BLD-Energy code compliance | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | PART |
Jim Storey
|
|
|
Justin Phone #: ###-#### rolled to monday.
|
BLD-Framing/Rough-in | 2/5/2020 | 2/5/2020 | 2/5/2020 | P | PART |
Jim Storey
|
|
|
justin Phone #: ###-#### support trusses into 3ply 2nd floor/ mlb hangers under stairs. ok to insulate upon hvac aproval.
|
BLD-Wall Bracing | 12/18/2019 | 12/18/2019 | 12/18/2019 | P | PART |
Dave Hannah
|
|
|
JUSTIN Phone #: ###-#### needs to install one hd hold down at garage front and fix two portal frames ok to cover ext
|
BLD-Foundation | 10/30/2019 | 10/31/2019 | 10/31/2019 | A | PASS |
Jim Storey
|
|
|
stem walls // Jose Phone #: ###-####
|
BLD-Footing | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | PASS |
Jim Storey
|
|
|
Jose Phone #: ###-####
|