Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD19-03682
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 1701 S DRACO PL
Project NameFlorzic Addition
Customer NumberROUTE TO HILLSIDE AND ESC
ePlanReviewNo
Description
WUI - HILLSIDE - Permit for a 204sq' addition that adds a Bedroom and Full Bath. All work per plans, notations, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/11/20202/11/20202/11/2020PPASS
DetailsBrandon Shaw
Call me 30 to 45 minutes prior please so I can make sure we have access to the home thank you Phone #: ###-#### Inspection requested via web by bryan murdoch
DOC - Permit Finaled2/11/20202/11/20202/11/2020PPASS
DetailsBrandon Shaw
BLD-Energy code compliance12/16/201912/16/201912/16/2019APASS
DetailsBrandon Shaw
Ring doorbell and the grandmother will let you in. Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Framing/Rough-in12/11/201912/11/201912/11/2019PPASS
DetailsBrandon Shaw
Walk around the right side of the home and you can enter the addition from there Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Wall Bracing12/11/201912/11/201912/11/2019PPASS
DetailsBrandon Shaw
Walk around the right side of the home and you can enter the addition from there Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Foundation11/5/201911/6/201911/6/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing11/4/201911/5/201911/5/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing11/4/201911/4/201911/4/2019PFAIL
DetailsBrandon Shaw
Not ready, no plans/permit on site...