Permit Information
Permit NumberBLD19-03701
StatusFinaled
Name KAI LLC
Site Address 2022 S HILTON ST
Project Name2022 HILTON BUILD
Customer Number 
ePlanReviewNo
Description
**PLAN MODIFICATION - 02/04/20 - reconfiguring stairs and deck for detached garage upper level JJN** **PLAN MODIFICATION 12-23-19 - Updated engineering to for hold downs and balloon framing at stairwell JJN** **PRESCIRPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2789 sq. ft., two story (first story 1714 sq. ft., second story 1075 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 656 sq. ft. of covered patio/porch and 450 sqft attached garage and a 528 sq. ft. detached garage with second floor storage space per the approved plans and any notations. R-1B zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/10/20208/11/20208/11/2020APASS
DetailsTell Riley
Mark - */Screened*/ Phone #: ###-####//corrections have been completed//
DOC - Permit Finaled8/11/20208/11/20208/11/2020PPASS
DetailsTell Riley
BLD-Final8/10/20208/10/20208/10/2020PFAIL
DetailsTell Riley
screened // Mark Phone #: ###-####//handrail at top flight of stairs on exterior stariway needs to return to post//
BLD-Final8/6/20208/7/20208/7/2020PFAIL
DetailsTell Riley
Call for access ... ok with video/photo // Mark Phone #: ###-####//handrail on exterior stairs does not mee code requirements// see correction notice for code sections of handrails//other corrections have been made//
BLD-Conference8/6/20208/6/20208/6/2020PDONE
DetailsTell Riley
Zack-###-####- first thing
BLD-Conference8/6/20208/6/20208/6/2020ADONE
DetailsTell Riley
Zack-###-####- first thing
BLD-Final8/3/20208/4/20208/4/2020AFAIL
DetailsTell Riley
Mark *no one on site, call for access* Screened* Phone #: ###-####//correction notice posted for three corrections that were not completed for code compliance//
BLD-Blower Door Test Results8/4/20208/4/20208/4/2020ADONE
DetailsTell Riley
3.8 ACH 50
BLD-Final6/24/20206/25/20206/25/2020AFAIL
DetailsMike Jordan
call for garage code - screened // Mark Phone #: ###-####. Provide blower door test result and post. Firecaulk all penetrations in garage. Steps in garage exceed the max 3/8 inch measurement between steps. Guardrail upstairs does not meet the 36 inch min. height requirment. Provide code compliant handrail on exterior stairs, guards at mid landing closest to garage exceed the 4 incnh max spacing. Correction notice posted.
BLD-Conference3/26/20203/27/20203/27/2020ADONE
DetailsTell Riley
adam Phone #: ###-####//discussed via phone, front door will be required to be main egress, one step allowed to landing, landing must be 36" in direction of travel and as wide as door//also sent photo of code sections for required egress and landing//
BLD-Energy code compliance2/21/20202/24/20202/24/2020APASS
DetailsTell Riley
Mark Phone #: ###-####//header added//insulation ok in walls//one attic area is R38 and needs to be R49--let contractor know prior to cover R49 needs to be installed//garage walls and ceiling insulated//second story of garage not insulated//will check deck and stairs at final-no handrails installed//
BLD-Framing/Rough-in2/14/20202/18/20202/18/2020APART
DetailsTell Riley
Mark- please call for access Phone #: ###-####//still needs header at stairs over mechanical on exterior wall//ok to insulate house and garage//steps, deck etc has several code issues, went over onsite//
BLD-Framing/Rough-in1/31/20202/3/20202/3/2020APART
DetailsTell Riley
Mark Phone #: ###-####//see red marks for corrections//need mech permit for FP//no access to garage 2n floor//ok to insulate house only//
BLD-Conference1/30/20201/30/20201/30/2020PFAIL
DetailsBrandon Shaw
Stop Work Order posted for detached garage...
BLD19-03701 is for new familiy dwelling with attached garage only. Seperate permit is needed for detached garage with ADU...
PDS approval needed for ADU...
BLD-Wall Bracing12/30/201912/30/201912/30/2019PPART
DetailsTell Riley
Mark Phone #: ###-####//exterior ok//will need to make corrections to interior shear locations--check at framing//
BLD-Wall Bracing12/19/201912/19/201912/19/2019PFAIL
DetailsTell Riley
Mark Phone #: ###-####//need to add hardware to portal frames//need conversion for staples from engineer//add blockin as discussed//add hot dipped galvanized nails at sill plates//
BLD-Conference12/10/201912/11/201912/11/2019PDONE
DetailsTell Riley
call Mark ###-####//discrepancies in engineering and architectural plans for shear and hold down locations//plan mod required for changes to correct//1 ft encroachment on side setback will need to be approved by zoning//
BLD-Conference12/10/201912/10/201912/10/2019PDONE
DetailsTell Riley
mark Phone #: ###-####
BLD-Conference12/10/201912/10/201912/10/2019PCANC
DetailsTell Riley
call Mark ###-####
BLD-Framing/Rough-in11/27/201911/29/201911/29/2019PCANC
DetailsTell Riley
Mark cancel and will call back to reschedule. floor // Mark Phone #: ###-####
BLD-Foundation11/21/201911/21/201911/21/2019PPART
DetailsTell Riley
Adam- pouring at 2pm Phone #: ###-####//WIP-will get bolts and hold downs installed//blankets onsite//
BLD-Footing11/18/201911/18/201911/18/2019PPART
DetailsTell Riley
Adam - pouring schedule for 1:30 Phone #: ###-####//rebar per plans//setbacks per plans//WIP...