BLD-Final | 8/10/2020 | 8/11/2020 | 8/11/2020 | A | PASS |
Tell Riley
|
|
|
Mark - */Screened*/ Phone #: ###-####//corrections have been completed//
|
DOC - Permit Finaled | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 8/10/2020 | 8/10/2020 | 8/10/2020 | P | FAIL |
Tell Riley
|
|
|
screened // Mark Phone #: ###-####//handrail at top flight of stairs on exterior stariway needs to return to post//
|
BLD-Final | 8/6/2020 | 8/7/2020 | 8/7/2020 | P | FAIL |
Tell Riley
|
|
|
Call for access ... ok with video/photo // Mark Phone #: ###-####//handrail on exterior stairs does not mee code requirements// see correction notice for code sections of handrails//other corrections have been made//
|
BLD-Conference | 8/6/2020 | 8/6/2020 | 8/6/2020 | P | DONE |
Tell Riley
|
|
|
Zack-###-####- first thing
|
BLD-Conference | 8/6/2020 | 8/6/2020 | 8/6/2020 | A | DONE |
Tell Riley
|
|
|
Zack-###-####- first thing
|
BLD-Final | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | FAIL |
Tell Riley
|
|
|
Mark *no one on site, call for access* Screened* Phone #: ###-####//correction notice posted for three corrections that were not completed for code compliance//
|
BLD-Blower Door Test Results | 8/4/2020 | 8/4/2020 | 8/4/2020 | A | DONE |
Tell Riley
|
|
|
3.8 ACH 50
|
BLD-Final | 6/24/2020 | 6/25/2020 | 6/25/2020 | A | FAIL |
Mike Jordan
|
|
|
call for garage code - screened // Mark Phone #: ###-####. Provide blower door test result and post. Firecaulk all penetrations in garage. Steps in garage exceed the max 3/8 inch measurement between steps. Guardrail upstairs does not meet the 36 inch min. height requirment. Provide code compliant handrail on exterior stairs, guards at mid landing closest to garage exceed the 4 incnh max spacing. Correction notice posted.
|
BLD-Conference | 3/26/2020 | 3/27/2020 | 3/27/2020 | A | DONE |
Tell Riley
|
|
|
adam Phone #: ###-####//discussed via phone, front door will be required to be main egress, one step allowed to landing, landing must be 36" in direction of travel and as wide as door//also sent photo of code sections for required egress and landing//
|
BLD-Energy code compliance | 2/21/2020 | 2/24/2020 | 2/24/2020 | A | PASS |
Tell Riley
|
|
|
Mark Phone #: ###-####//header added//insulation ok in walls//one attic area is R38 and needs to be R49--let contractor know prior to cover R49 needs to be installed//garage walls and ceiling insulated//second story of garage not insulated//will check deck and stairs at final-no handrails installed//
|
BLD-Framing/Rough-in | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | PART |
Tell Riley
|
|
|
Mark- please call for access Phone #: ###-####//still needs header at stairs over mechanical on exterior wall//ok to insulate house and garage//steps, deck etc has several code issues, went over onsite//
|
BLD-Framing/Rough-in | 1/31/2020 | 2/3/2020 | 2/3/2020 | A | PART |
Tell Riley
|
|
|
Mark Phone #: ###-####//see red marks for corrections//need mech permit for FP//no access to garage 2n floor//ok to insulate house only//
|
BLD-Conference | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | FAIL |
Brandon Shaw
|
|
|
Stop Work Order posted for detached garage... BLD19-03701 is for new familiy dwelling with attached garage only. Seperate permit is needed for detached garage with ADU... PDS approval needed for ADU...
|
BLD-Wall Bracing | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PART |
Tell Riley
|
|
|
Mark Phone #: ###-####//exterior ok//will need to make corrections to interior shear locations--check at framing//
|
BLD-Wall Bracing | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | FAIL |
Tell Riley
|
|
|
Mark Phone #: ###-####//need to add hardware to portal frames//need conversion for staples from engineer//add blockin as discussed//add hot dipped galvanized nails at sill plates//
|
BLD-Conference | 12/10/2019 | 12/11/2019 | 12/11/2019 | P | DONE |
Tell Riley
|
|
|
call Mark ###-####//discrepancies in engineering and architectural plans for shear and hold down locations//plan mod required for changes to correct//1 ft encroachment on side setback will need to be approved by zoning//
|
BLD-Conference | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | DONE |
Tell Riley
|
|
|
mark Phone #: ###-####
|
BLD-Conference | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | CANC |
Tell Riley
|
|
|
call Mark ###-####
|
BLD-Framing/Rough-in | 11/27/2019 | 11/29/2019 | 11/29/2019 | P | CANC |
Tell Riley
|
|
|
Mark cancel and will call back to reschedule. floor // Mark Phone #: ###-####
|
BLD-Foundation | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PART |
Tell Riley
|
|
|
Adam- pouring at 2pm Phone #: ###-####//WIP-will get bolts and hold downs installed//blankets onsite//
|
BLD-Footing | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PART |
Tell Riley
|
|
|
Adam - pouring schedule for 1:30 Phone #: ###-####//rebar per plans//setbacks per plans//WIP...
|