BLD-Final | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
Tell Riley
|
|
|
|
DOC - Permit Finaled | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Blower Door Test Results | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | DONE |
Tell Riley
|
|
|
3.72 ACH 50
|
BLD-Final | 2/27/2020 | 2/28/2020 | 2/28/2020 | A | NR |
Tell Riley
|
|
|
Robert Phone #: ###-####///need blower door test//attic access located in garage and attic can be accessed througout the home//CN posted//
|
BLD-Wall Bracing | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Tell Riley
|
|
|
Robert Phone #: ###-####//Gyp board shear ok in the two areas noted on plans//
|
BLD-Energy code compliance | 1/3/2020 | 1/6/2020 | 1/6/2020 | A | PASS |
Tell Riley
|
|
|
Robert Phone #: ###-####
|
BLD-Framing/Rough-in | 1/6/2020 | 1/6/2020 | 1/6/2020 | A | PASS |
Tell Riley
|
|
|
Framing corrections made//Mechancal roughs ok//
|
BLD-Framing/Rough-in | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | PEND |
Tell Riley
|
|
|
robert Phone #: ###-####//pending mechanical approval on FP's//see truss packet and red marks//add plys to headers per plans//ok to insulate once mechanical is approved//
|
BLD-Wall Bracing | 12/6/2019 | 12/9/2019 | 12/9/2019 | P | PASS |
Tell Riley
|
|
|
shear // Robert Phone #: ###-####
|
BLD-Foundation | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | PASS |
Tell Riley
|
|
|
Nick- foundation wall inspection-Concrete at 11am (was infrom that time is not guaranteed) Phone #: ###-####
|
BLD-Footing | 11/2/2019 | 11/4/2019 | 11/4/2019 | A | PASS |
Brandon Shaw
|
|
|
Footing inspection. Concrete scheduled for 10:30 AM Monday November 4
Please call me if you have any questions. Phone #: ###-#### Inspection requested via web by Nick Louie
|