BLD-Final | 7/9/2020 | 7/9/2020 | 7/9/2020 | P | FAIL |
Tell Riley
|
|
|
Please call when you are on the way so that I can have the home open cell ###-#### Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//left CN with Brad//corrections will need to be completed for final//
|
BLD-Wall cover | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | PART |
Tell Riley
|
|
|
Drywall Sheer inspection Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//ok when added screws installed as marked on plans//
|
BLD-Energy code compliance | 1/14/2020 | 1/14/2020 | 1/14/2020 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Pfannmuller
|
BLD-Framing/Rough-in | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PASS |
Tell Riley
|
|
|
Please call when you make it to the house so that we can discuss the additional engineering reports to address the correction letter. thank you, Brad Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//corrections made//letter from engineer stamped outlining some corrections that he has approved//ok to insulate//
|
BLD-Framing/Rough-in | 1/6/2020 | 1/6/2020 | 1/6/2020 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//CN posted-to many to list see onsite//
|
BLD-Energy code compliance | 1/3/2020 | 1/6/2020 | 1/6/2020 | A | CANC |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//needed framing//
|
BLD-Conference | 11/27/2019 | 11/27/2019 | 11/27/2019 | A | PASS |
Tell Riley
|
|
|
Portal frame has been reinstalled and the Engineer has done a site inspection a has a new stamped areas of correction for the framing Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//shear ok per plans//clarification for hold downs provided and stamped by design engineer//nailing ok//hold downs installed correctly//finish sheating at bottom of walls with same nailing patterns//
|
BLD-Conference | 11/27/2019 | 11/27/2019 | 11/27/2019 | A | CANC |
Tell Riley
|
|
|
Portal frame has been reinstalled and the Engineer has done a site inspection a has a new stamped areas of correction for the framing Phone #: ###-#### >> Inspection requested via web by Brad Pfannmuller Inspection cancelled from web by: Brad Pfannmuller
|
BLD-Conference | 11/25/2019 | 11/25/2019 | 11/25/2019 | A | FAIL |
Tell Riley
|
|
|
The hold downs missing have been installed and we are ready for the wall bracing inspection please. Thanks Phone #: ###-#### Inspection requested via web by Brad Pfannmuller//need to install hold downs correctly per manufacturers requirements//install hold downs in correct locations//frame portal frames per plans and in correct locations//address hold downs H1 nad H3 have engineer give size//address issue with wall in garage overhanging foundation and bearing of trusses//nailing will need to reflect engineering//
|
BLD-Wall Bracing | 11/11/2019 | 11/12/2019 | 11/12/2019 | P | PART |
Dave Hannah
|
|
|
Phone #: 2088991061 >> Inspection requested via mobile web by Brad Pfannmuller ok to rap ext of garage but needs to install hold downs on the rest
|