BLD-Final | 6/23/2020 | 6/24/2020 | 6/24/2020 | A | PASS |
Tony Young
|
|
|
Garage code is 1977. Thanks! Phone #: ###-#### Inspection requested via web by Craig Hammett
|
DOC - Permit Finaled | 6/24/2020 | 6/24/2020 | 6/24/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 6/24/2020 | 6/24/2020 | 6/24/2020 | P | DONE |
Tony Young
|
|
|
Garage code is 1977. Thanks! Phone #: ###-#### Inspection requested via web by Craig Hammett// 3,79
|
BLD-Energy code compliance | 4/7/2020 | 4/8/2020 | 4/8/2020 | A | PART |
Tony Young
|
|
|
*screened* - Craig Phone #: ###-####// contractor to verify the access for attic blow in
|
BLD-Framing/Rough-in | 4/7/2020 | 4/8/2020 | 4/8/2020 | A | PASS |
Tony Young
|
|
|
*screened* - Craig Phone #: ###-####
|
BLD-Framing/Rough-in | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | FAIL |
Tony Young
|
|
|
Craig Phone #: ###-####,, c/n posted,, straps, point loads,, overbuild bearing, double king studs, etc,, ok to insulate if needed
|
BLD-Wall Bracing | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | PART |
Tell Riley
|
|
|
Shear // Craig Phone #: ###-####//ok when nailing added and blocking added//
|
BLD-Wall Bracing | 3/11/2020 | 3/12/2020 | 3/12/2020 | A | NR |
Mike Jordan
|
|
|
Greg Phone #: ###-####
|
BLD-Foundation | 2/2/2020 | 2/3/2020 | 2/3/2020 | A | DONE |
Tony Young
|
|
|
Foundation wall inspection. Thank you! Phone #: ###-#### Inspection requested via web by Craig Hammett// already poured
|
BLD-Footing | 1/29/2020 | 1/30/2020 | 1/30/2020 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|