BLD-Ceiling Grid Inspection | 8/11/2020 | 8/12/2020 | 8/12/2020 | A | PASS |
Mike Jordan
|
|
|
Jason */Screened*/ Phone #: ###-####. Phase 2.
|
BLD-Framing/Rough-in | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | PASS |
Jim Storey
|
|
|
screened // Cameron Phone #: ###-####
|
FIRE-Final Inspection | 5/19/2020 | 5/19/2020 | 5/19/2020 | P | PART |
Troy Cobbley
|
|
|
Life safety passed for phase 2, west side of the building.
Jason *screened* Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/14/2020 | 5/14/2020 | 5/14/2020 | P | PASS |
Mike Jordan
|
|
|
Screened- Jason Phone #: ###-####. Phase 1 grid ok.
|
BLD-Ceiling Grid Inspection | 4/20/2020 | 4/20/2020 | 4/20/2020 | P | NR |
Mike Jordan
|
|
|
SCREENED // JASON Phone #: ###-####. Mech rough in inspection has failed.
|
BLD-Ceiling Grid Inspection | 4/16/2020 | 4/16/2020 | 4/16/2020 | P | NR |
Mike Jordan
|
|
|
Jason - no one is at the job site willing to do virtual Phone #: ###-####. Needs mech rough in inspection first.
|
BLD-Ceiling Grid Inspection | 4/7/2020 | 4/7/2020 | 4/7/2020 | P | NR |
Mike Jordan
|
|
|
screened willing to do video/phot // Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | PART |
Mike Jordan
|
|
|
Jason Phone #: ###-####. Interior steel stud framed walls and soffits for phase 1 construction. Pending electrical rough in inspection.
|
BLD-Framing/Rough-in | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | PART |
Mike Jordan
|
|
|
Jason Phone #: ###-####. Interior steel stud framed walls and soffits in open office area phase 1. Needs electrical rough in inspection. Also needs to add missing screws in framing.
|