(AAA BOISE) ***PLAN MOD TO UTILIZE DIFFERENT ROOFING MATERIAL AT LOBBY UPDATED STRUCTURAL AND MECHANICAL SUBMITTALS*** MDH Permit to remodel an existing 14,270 sqft. office building to include a 1,585 sqft event space (A-3) in 3 phases. Work to include: Demo non-load bearings walls and finishes, construct non-load bearing walls, interior doors, millwork, (2) accessible restrooms, site work, roof replacement, exterior roof canopy extension, mechanical work, electrical work, and plumbing work. Interior finishes shall be in compliance with Ch. 8 of the 2015 IBC. This building is fully fire sprinkled. Any alterations or modifications to the buildings fire sprinkler or fire alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise fire department. **MDH**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Ceiling Grid Inspection8/11/20208/12/20208/12/2020APASS
DetailsMike Jordan
Jason */Screened*/ Phone #: ###-####. Phase 2.
BLD-Framing/Rough-in6/30/20207/1/20207/1/2020APASS
DetailsJim Storey
screened // Cameron Phone #: ###-####
FIRE-Final Inspection5/19/20205/19/20205/19/2020PPART
DetailsTroy Cobbley
Life safety passed for phase 2, west side of the building.

Jason *screened* Phone #: ###-####
BLD-Ceiling Grid Inspection5/14/20205/14/20205/14/2020PPASS
DetailsMike Jordan
Screened- Jason Phone #: ###-####. Phase 1 grid ok.
BLD-Ceiling Grid Inspection4/20/20204/20/20204/20/2020PNR
DetailsMike Jordan
SCREENED // JASON Phone #: ###-####. Mech rough in inspection has failed.
BLD-Ceiling Grid Inspection4/16/20204/16/20204/16/2020PNR
DetailsMike Jordan
Jason - no one is at the job site willing to do virtual Phone #: ###-####. Needs mech rough in inspection first.
BLD-Ceiling Grid Inspection4/7/20204/7/20204/7/2020PNR
DetailsMike Jordan
screened willing to do video/phot // Jason Phone #: ###-####
BLD-Framing/Rough-in3/9/20203/9/20203/9/2020PPART
DetailsMike Jordan
Jason Phone #: ###-####. Interior steel stud framed walls and soffits for phase 1 construction. Pending electrical rough in inspection.
BLD-Framing/Rough-in3/5/20203/6/20203/6/2020APART
DetailsMike Jordan
Jason Phone #: ###-####. Interior steel stud framed walls and soffits in open office area phase 1. Needs electrical rough in inspection. Also needs to add missing screws in framing.