BLD-Final | 7/17/2020 | 7/17/2020 | 7/17/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by justin reynolds
|
DOC - Permit Finaled | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 7/17/2020 | 7/17/2020 | 7/17/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.03
|
BLD-Energy code compliance | 5/8/2020 | 5/11/2020 | 5/11/2020 | A | PASS |
Brandon Shaw
|
|
|
Screened- Justin Phone #: ###-####
|
BLD-Energy code compliance | 5/8/2020 | 5/8/2020 | 5/8/2020 | P | NR |
Tony Young
|
|
|
Screened- Justin Phone #: ###-####
|
BLD-Other | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Brandon Shaw
|
|
|
Soffit inspection please Phone #: ###-#### Inspection requested via web by justin reynolds
|
BLD-Framing/Rough-in | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Brandon Shaw
|
|
|
Engineering letter approving as built received by email, physical copy onsite...
|
BLD-Framing/Rough-in | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | FAIL |
Brandon Shaw
|
|
|
Drag trusses, and drag straps to be as per plans, provide Engineering approval for as built or revised Engineering... Install 6x6 per plans or Engineering approval for as built... Per plans, interior shear walls to be blocked at edges... OK to insulate...
|
BLD-Framing/Rough-in | 4/16/2020 | 4/17/2020 | 4/17/2020 | A | NR |
Brandon Shaw
|
|
|
Need to update permit and receive letter stating fire sprinklers are NOT required...
|
BLD-Framing/Rough-in | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by justin reynolds
|
BLD-Wall Bracing | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by justin reynolds
|
BLD-Foundation | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | PART |
Tony Young
|
|
|
curt Phone #: ###-####// work in progress,, ok
|
BLD-Footing | 1/13/2020 | 1/17/2020 | 1/17/2020 | A | PASS |
Tony Young
|
|
|
curt Phone #: ###-####
|