BLD-Aging Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 | | PASS |
Tell Riley
|
|
|
|
BLD-Foundation | 12/13/2019 | 12/16/2019 | 12/16/2019 | A | PART |
Tell Riley
|
|
|
Dane Phone #: ###-####//blankets onsite--covered all weekend//workers are heating steel// forms are warm//will cover after pour//
|
BLD-Foundation | 12/12/2019 | 12/13/2019 | 12/13/2019 | P | CANC |
Tell Riley
|
|
|
Dane - foundation wall Phone #: ###-####
|
BLD-Footing | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | PASS |
Tell Riley
|
|
|
10am pouring - Dane Phone #: ###-####//temps ok//bar installed per plans//setbacks set by surveyor//
|
BLD-Footing | 12/9/2019 | 12/10/2019 | 12/10/2019 | A | FAIL |
Tell Riley
|
|
|
Dane Phone #: ###-####//no blankets onsite,ground temps below freezing//
|