BLD-Final | 4/30/2020 | 5/1/2020 | 5/1/2020 | P | PASS |
Jim Storey
|
|
|
Screened-Paul Phone #: ###-####
|
BLD-Final | 4/20/2020 | 4/22/2020 | 4/22/2020 | P | NR |
Jim Storey
|
|
|
Paul Phone #: ###-#### need ele
|
FIRE-Final Inspection | 4/20/2020 | 4/22/2020 | 4/22/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Paul Phone #: ###-####
|
FIRE-Final Inspection | 4/13/2020 | 4/14/2020 | 4/14/2020 | P | FAIL |
Jim Page
|
|
|
Ansul systems that was protecting the de-commissioned paint booth will need to be removed, a demo FIR permit is required for removal of the fire system. Provide single action door hardware on main entry as discussed, door hardware in place would not operate when locked. Provide fire extinguishers with current inspection tags and place as discussed. Provide maximum occupancy placard as shown on city approved drawings. Provide code compliant addressing on the fire access side of the building as discussed.
*screened* Check Ansul system, please call ahead for access - Paul Phone #: ###-####
|
BLD-Framing/Rough-in | 3/25/2020 | 3/27/2020 | 3/27/2020 | P | PASS |
Jim Storey
|
|
|
Paul Phone #: ###-#### fire wall complet
|
BLD-Framing/Rough-in | 3/23/2020 | 3/24/2020 | 3/24/2020 | P | PASS |
Jim Storey
|
|
|
Paul Phone #: ###-#### interior gyp ok parapet ok .
|
BLD-Conference | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | DONE |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 2/19/2020 | 2/21/2020 | 2/21/2020 | A | NR |
Jim Storey
|
|
|
Paul Phone #: ###-####
|