BLD-Final | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | PASS |
Mike Jordan
|
|
|
Electrical was finaled this morning, looking to close out this permit as well. Phone #: ###-#### Inspection requested via web by Kevin Beals
|
DOC - Permit Finaled | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 11/15/2019 | 11/18/2019 | 11/18/2019 | A | CANC |
Mike Jordan
|
|
|
Alan Phone #: ###-####
|
BLD-Wall Bracing | 11/18/2019 | 11/18/2019 | 11/18/2019 | A | PASS |
Mike Jordan
|
|
|
Alan Phone #: ###-####
|
BLD-Framing/Rough-in | 11/14/2019 | 11/15/2019 | 11/15/2019 | A | FAIL |
Mike Jordan
|
|
|
Alan Phone #: ###-####. Fateners still overspaced, needs to fasten sheathing at blocking.
|
BLD-Framing/Rough-in | 11/13/2019 | 11/13/2019 | 11/13/2019 | P | FAIL |
Mike Jordan
|
|
|
Allen Phone #: ###-####. Provide hot dipped galvanized nails nails into sill plateat 6 inches on center. Missing fasteners and are overspaced. Missing nails on portal frame, header not long enough. See detail provided on approved plans. Correction notice posted.
|
BLD-Footing | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PART |
Mike Jordan
|
|
|
Brandon Phone #: ###-####
|