BLD-Energy code compliance | 4/1/2020 | 4/2/2020 | 4/2/2020 | A | PASS |
Tell Riley
|
|
|
Insulation inspection R-38 closed cell spray in ceiling, bat walls, floor bat done with flooring R-30 Home owner home access site through gate on left of house enter sliding door. room contained away from house members with plastic walls. Phone #: ###-#### Inspection requested via web by Tara Vreeland
|
BLD-Framing/Rough-in | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | PASS |
Brandon Shaw
|
|
|
Client is home. Access project through gate left side of house into back yard and in sliding door. Blocked off from resat of house inside. Phone #: ###-#### Inspection requested via web by Tara Vreeland
|
BLD-Wall Bracing | 3/20/2020 | 3/23/2020 | 3/23/2020 | A | PASS |
Dave Hannah
|
|
|
Sheer inspection, homeowner will be home or we can meet inspector if given a 30 minute notice. ###-#### Tara
Note: note on sill plate about additional plate on top of visible sill plate set back 1/2" I have picture if needed. Phone #: ###-#### Inspection requested via web by Tara Vreeland
|
BLD-Footing | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|