BLD-Final | 8/13/2020 | 8/13/2020 | 8/13/2020 | P | PASS |
Tell Riley
|
|
|
Vince */Screened*/ Phone #: ###-####
|
DOC - Permit Finaled | 8/13/2020 | 8/13/2020 | 8/13/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 8/12/2020 | 8/13/2020 | 8/13/2020 | A | NR |
Tell Riley
|
|
|
screened // Vince Phone #: ###-####//need to clean up, street and underfloor//add insulatin to access hatch in bedroom//
|
BLD-Blower Door Test Results | 8/13/2020 | 8/13/2020 | 8/13/2020 | A | DONE |
Tell Riley
|
|
|
4.5 ACH 50
|
BLD-Energy code compliance | 5/13/2020 | 5/13/2020 | 5/13/2020 | P | PASS |
Jim Storey
|
|
|
Vince Phone #: ###-####
|
BLD-Framing/Rough-in | 5/7/2020 | 5/8/2020 | 5/8/2020 | A | PASS |
Dave Hannah
|
|
|
*screened* Vince Phone #: ###-####
|
BLD-Wall Bracing | 4/6/2020 | 4/6/2020 | 4/6/2020 | P | PASS |
Tell Riley
|
|
|
clear shear // vince Phone #: ###-####
|
BLD-Foundation | 4/6/2020 | 4/6/2020 | 4/6/2020 | P | DEFR |
Tell Riley
|
|
|
contractor assumes all liability for foundation as no inspection was scheduled, foundation was not inspected//
|
BLD-Footing | 2/26/2020 | 2/27/2020 | 2/27/2020 | P | PART |
Tell Riley
|
|
|
Chris Phone #: ###-####//front setbacks tight--will need to remeasure at wall inspection to verify//
|