BLD-Ceiling Grid Inspection | 7/21/2020 | 7/22/2020 | 7/22/2020 | A | PASS |
Jim Storey
|
|
|
Please call Jerry Jones before arrival ###-#### Phone #: ###-#### Inspection requested via web by Jerry Jones
|
BLD-Framing/Rough-in | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Jim Storey
|
|
|
Jerry *screened* Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | PASS |
Jim Storey
|
|
|
screened // Jerry Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/20/2020 | 4/20/2020 | 4/20/2020 | P | PART |
Jim Storey
|
|
|
Jerry **cleared** Phone #: ###-#### fire stopping emt/ duct/ plm south wall and east wall// ceilling supports ok.
|
BLD-Wall Bracing | 2/27/2020 | 2/28/2020 | 2/28/2020 | A | PASS |
Jim Storey
|
|
|
Please call Jerry Jones (###-####) 10 minutes ahead of arrival @ B26 lobby. Phone #: ###-#### Inspection requested via web by Jerry Jones wall ok
|